BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Turlock, California. Completed plans call for the renovation of a educational facility.

The project consists of replacement of the HVAC systems in three buildings: the Corporation Yard (004), Gymnasium (015), and the Fieldhouse (005). The details for building specific project descriptions are below Corporation Yard: Existing packaged and split AC systems with either heat pump or natural gas furnace will be removed, as well as selected ductwork. The new HVAC system will be a central station rooftop air handler with chilled water cooling and heating was heating connected to the points of connection provided in Phase 1, which is complete. New ductwork and terminal boxes with reheat will provide zone level temperature control. Two ductless mini split AC units serving data system closets will also be replaced. All air handler and zone level controls shall be incorporated into the existing building management system per plans. Any ceiling work required to provide access for mechanical construction shall be included as generally indicated on the plans Gymnasium & Fieldhouse: The Work includes modifications to the mechanical systems and controls of the campus Gymnasium/Fieldhouse building, as delineated on the project drawing set. Demolition includes decommissioning and removal of the existing dx and HHW air moving equipment, exhaust fans, and portions of ductwork. New work includes three new chilled/heating water air handlers, zone level terminal boxes with HHW reheat, exhaust fans, a new exterior mechanical yard, additions to the chilled water and heating water distribution, & all associated controls. All new controls shall be connected to the existing systems for control and monitoring by central plant facility staff 1) Demolition - DLC 621509 2) Concrete - West Valley Concrete - 915363 3) CMU - Mcphee - 675127 4) K& M Welding - 711135 5) Roofing - Kingo - 576154 6) Accoustical Ceiling - Ultra - 1082174 7) HVAC - Modern Air - 569680 8) Electrical - Collin - 787006 9) Earthwork - Rapadale - 478340 10) Framing - Red River 1064518 11) Fencing - Ace - 658680 12) Elevating Sales - 200000

Award

Educational

$5,152,674.00

Public - State/Provincial

Renovation

67

17

19

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
69
Bidding Soon
1,317
All Active Projects
579
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.