BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2023 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a municipal facility in Cosmopolis, Washington. Completed plans call for the construction of a 4,545-square-foot, one-story above grade municipal facility; and for site work for a municipal facility.

Submit questions no later than Friday, May 19, 2023 Contractor shall secure, include costs therefore in the Bid, and pay for bonds issued by a bonding company with a Bests rating of A, or better, and licensed to transact business in the State of Washington in Statutory Form. Liability under each of the bonds shall be 100 percent of the contract sum, including state sales tax, for: 1. Performance. 2. Labor and Material Payment. 3. One-year maintenance for correction of defective work. 1. A bid security, in the form of a certified check, bank cashiers check or bid bond is required with each Bid in an amount equal to (5) percent of the Base Bid, plus Additive Alternates, if any. 2. Should a bidder fail to enter into an Agreement with the Owner and/or fail to furnish the bonds required by the Contract Documents within ten (10) days after his/her Bid has been accepted, the Contractors Bid Security shall be forfeited to the Owner as liquidated damages, not as a penalty. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Provide all labor, materials and equipment required to complete all the Work under a single, lump sum contract for the New Municipal Building, located at 1312 1 st St, Cosmopolis, WA, as shown on the Drawings and described in the Project Manual. Items of the Work include, but are not limited to: 1. Concrete walks and asphalt pavement. 2. 9,219 square foot, single-story with mezzanine, wood-framed building. 3. Pile supported structural slab. 4. Fiber-cement and metal siding and trim and metal roofing. 5. Aluminum framed windows, aluminum doors and storefront, metal doors and frames and wood doors and metal frames. 6. Automatic fire suppression. 7. Emergency generator Estimated construction cost is between $2.6 and $2.8 Million 4,545 sf, single-story, wood frame addition to the existing 1,500 City Hall building to accommodate the City Hall and Police Department operations. Direct all questions in writing to Monika Kuhnau AIA at the office of the Architect, email monika@harborarchitects.com. Question Deadline 05/24/2023 at 12:00 PM PT

Bid Results

Municipal

$2,915,000.00

Public - City

New Construction, Site Work

65

28

22

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
92
Bidding Soon
1,212
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2023

July 24, 2023

Project location map

1312 1st St, Cosmopolis, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.