BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Wayne City, Illinois. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 26, 2023, at 1:30 PM at the Region Four/District Seven Office in Effingham. The anticipated scope of work is complete removal and replacement of S.N. 096-0053 and 096- 0059 carrying I-64 over US 45. The profile grade of the I-64 bridges and approach roadways will be raised to increase the vertical clearance above US 45 from existing 14’-1” to proposed 16’-6” minimum. S.N. 096-0049 and S.N. 096-0050 carrying I-64 over the abandoned railroad 0.5 miles west of US 45 will be removed and filled-in with embankment and pavement. Phase I engineering services are required to provide a DTM and topographic survey of the existing bridges and approach roadways, bridge condition reports (BCR), structure reports, subsurface investigation, structure geotechnical reports (SGR), type size and location plans (TSL), and development of a Phase I project report. District Seven will be responsible for environmental coordination and utility coordination. Phase II engineering services are required to provide final documents for PSE submittal including final structure plans, final roadway plans, maintenance of traffic plans, estimate of time, and special provisions. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 32 - RFQ Engineering - Replacement of Bridges on I-64 Over Us 45 and Over the Abandoned Railroad West of Us 45, Phase I/II Project, Wayne County, Region Four/district Seven

Conceptual

Bridges / Tunnels

$10,820,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
71
Bidding Soon
724
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

Project location map

I-64, Wayne City, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.