BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Effingham, Illinois. Contact the soliciting agency for additional information.

This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 2, 2023, at 1:30 PM at the Region Four/District Seven Office in Effingham. Phase I/II engineering services are required for various projects on various routes throughout District Seven. Phase I work, if required, may consist of conducting route surveys, hydraulic surveys, hydraulic analysis, geometric studies, preparing bridge condition reports, performing location studies, and preparing project reports (categorical exclusion projects only). This work will include data collection, development of alignment alternatives, cost estimates, traffic management analysis, accident analysis, TS&L structure plans, and other related work and exhibits necessary to produce the Project Report, as necessary. Phase II work, if required, may consist of conducting route surveys, hydraulic reports, traffic signal plans, preparation of TS&L plans, roadway plans, structure plans, ADA plans, and any other related work to complete final plans, specifications, and estimates, as necessary. The various proposed projects may consist of simple patching and resurfacing, widening, and resurfacing, and/or pavement replacement projects; structure repair, structure rehabilitation, and/or structure replacement projects. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Highways (Roads and Streets) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 36 - RFQ - Various Phase I/II Projects, Various Routes, Various Counties, Region Four/district Seven

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
23
Bidding Soon
417
All Active Projects
183
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2023

img_map_placeholder

Multiple Locations, Effingham, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.