Demolition, site work, paving, new construction and renovation of a mixed-use development in Bethesda, Maryland. Completed plans call for the expansion of a military facility and water / sewer project.

*As of August 15, 2023, the bids are pending at the owner. 1. CHILLED WATER PIPING - MECHANICAL ROOM: 1.1 DEMOLISH AND REPLACE THE EXISTING CHILLED WATER SUPPLY AND RETURN PIPING FROM THE UTILITY TUNNEL IN BUILDING 14E TO THE ISOLATION VALVES ON THE ROOF OF THE BUILDING 28 COMPLEX FOR EACH OF THE FOLLOWING AHU: 28-D-1, 28-C-2, 28-C-1, 28-B-1, 28-A-2. 1.2 DEMOLISH UNUSED EQUIPMENT AND ABANDONED PIPING IN MECHANICAL ROOM 14E. 1.3 FIRE STOP ALL PENETRATIONS THROUGH FIRE WALLS. 2. CHILLED WATER PIPING - ROOFTOP: 2.1 DEMOLISH ALL HEAT TRACE AND INSULATION FROM THE PANEL TO EACH AHUs. 2.2 REPLACE ALL INSULATION. FOLLOW INSULATION MATERIAL SPECIFICATIONS. 2.3 WEATHER SEAL ALL NEW ROOF PENETRATIONS. 2.4 BALANCE ALL CHILLED WATER VALVES AFTER INSTALL. BALANCE THE SYSTEM SO EACH AHU RECEIVES THE DESIRED CHW FLOW RATE. 3. PREHEAT COILS: 3.1 DEMOLISH AND REPLACE THE PREHEAT COILS FOR AHU 28-D-1, 28-C-2, 28-C-1, 28-B-1, AND 28-A-2. 3.2 DEMOLISH AND REPLACE ALL STEAM AND CONDENSATE PIPING FROM THE PREHEAT COILS TO THE LAST GATE VALVE FOR EACH AHU. 3.3 REPLACE ALL INSULATION DAMAGED OR REMOVED DURING DEMOLITION OF THE PREHEAT COILS AND PIPING. FOLLOW INSULATION MATERIAL SPECIFICATIONS. 4. BUILDING AUTOMATION SYSTEM (BAS) UPDATES: 4.1 UPDATE BAS GRAPHIC FOR EACH AHU TO SHOW PREHEAT COIL UPDATES. 4.2 UPDATE BAS GRAPHIC TO REMOVE DEMOLISHED CHW POINTS AND EQUIPMENT. 4.3 UPDATE SIEMENS PPCL CODE. REMOVE OBSOLETE CODE REFERRING TO THE DEMOLISHED BUILDING 28 CHILLED WATER SYSTEM AND ASSOCIATED EQUIPMENT. MODIFY THE PREHEAT CODE FOR EACH AHU TO CHANGE FROM FACE/BYPASS TO FULL FACE PREHEAT COILS AND FROM A SINGLE STEAM CONTROL VALVE TO A 1/3RD 2/3RD STEAM CONTROL VALVE SYSTEM. 4.4 INSTALL LOCAL CHILLED WATER DIFFERENTIAL PRESSURE SENSOR IN MECHANICAL ROOM 14E. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$1,000,000.00

Public - Federal

Demolition, New Construction, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
78
Bidding Soon
1,964
All Active Projects
763
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

September 25, 2023

img_map_placeholder

9000 Rockville Pike, Bethesda, MD

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.