BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in West Allis, Wisconsin. Completed plans call for site work for a water / sewer project.

The Contractor will clean, dewater, and assess using CCTV a section of Metropolitan Interceptor Sewer (MIS) on the west side of South 116th Street between West Oklahoma Avenue and Root River Parkway in West Allis. This pipe segment is 54 inches in diameter, 912 feet long, and contains a substantial amount of debris. Contract C02014 All questions related to this proposed contract, pre-bid presentation, or potential bidders list must be directed in writing to Nathan Churchill at nchurchill@mmsd.com by no later than 4:00 p.m. on June 9, 2023. Questions received after this deadline and/or questions directed to other contacts at the District will not be recognized. The Contractor will clean, dewater, and perform NASSCO condition assessment for 912 linear feet of 54-inch diameter reinforced concrete pipe. Approximately 210 feet from manhole 42406 is a significant joint-offset or sag. The Contractor shall collect data related to this structural defect and for the full length of pipe. Additionally, the Contractor is responsible for traffic control, flow control, and site restoration. The sewer is located on the west side of South 116th Street between West Oklahoma Avenue and the Root River Parkway. Minor manhole work for manhole 42405 and work on any other manhole to repair damage incidental to the work performed.

Bid Results

Water / Sewer

$262,105.00

Public - County

Site Work

11

9

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
134
Bidding Soon
2,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

July 17, 2023

Project location map

West Oklahoma Avenue and the Root River Parkway, West Allis, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.