Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 11, 2023 at 8:00 PM
Updated January 26, 2024
Renovation of a stadium in Midland, Michigan. Completed plans call for the renovation of a stadium.
Sealed bids will be accepted to provide the City of Midland with pricing Civic Arena Evaporative Condenser Replacement, per the attached specifications and standard instructions. Technical questions shall be directed to Tyler Abbs, Facilities Manager at (989) 837-3370. The City of Midland's is seeking bids from qualified contractors for the removal and replacement of the existing evaporative condenser at the Civic Arena. The replacement installation should be a turnkey operation from removal and disposal of the existing equipment to installing and commissioning new equipment. The City shall retain salvage rights for equipment or parts thereof prior to disposal. Any and all associated costs should be included in the bid. All required permits, performance and payment bonds Pumping tower and bleeding off the ammonia refrigeration in existing system Removal of all electrical to the closest junction or disconnect Removal of all required roof piping as required for evaporative condenser replacement Removal of existing Vilter Model VSA 491 tower Removal of existing tower, piping and other construction supplies from the roof Disposal of all materials per local and federal regulations Surface preparation of six (6) support brackets through the roof to remove all surface rust Painting of six (6) support brackets with black epoxy based paint. One coat primer and two top coats Construction and setting of new support structure to be mounted to existing six support brackets on the roof Paint all new steel supports with black epoxy based paint. One coat primer and two top coats Installation of new evaporative condenser, supports and piping on roof Set new Evapco eco-ATC-546A at 100.3% 3000.00 Tons NH3. Condensing Temperature 93.0 degrees F, Condensing Pressure 175 psi, Suction Temperature 10.0 degrees F, Entering Wet Bulb 77.9 degree F. Entering Dry Bulb Switchover 8.11 degree F. Tie fan motors into existing power disconnects on the roof per local electrical code Hook up tower motors to existing VFD's and reprogram as needed Install new piping and weld in place Paint all piping per industry color code Pipe in new 12" steel water drain line Pump out refrigerant lines and do a complete test check and start up Install new double check valves and a two way stop valve to be placed at the top of the discharge riser Install two new bleed valves on the outlet of the liquid lines Testing and balancing of new cooling tower Storage/holding of tower till it can be installed July 2024
Bid Results
Arenas / Stadiums
$244,175.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2023
July 6, 2023
405 Fast Ice Dr, Midland, MI
Related To This Project
Midland, MI
Bid Date: Jun 06 2023
Midland, MI
Bid Date: Jun 06 2023
Midland, MI
Bid Date: Jun 06 2023
Midland, MI
Bid Date: Jun 06 2023
Midland, MI
Bid Date: May 31 2023
Midland, MI
Bid Date: Jun 06 2023
Midland, MI
--
Midland, MI
Bid Date: Jun 02 2023
Midland, MI
Bid Date: May 18 2023
Midland, MI
Bid Date: May 16 2023
Midland, MI
Bid Date: Jun 06 2023
Midland, MI
Bid Date: May 16 2023
Midland, MI
Bid Date: May 09 2023
Midland, MI
Bid Date: May 09 2023
Midland, MI
Bid Date: Apr 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
