Renovation of a power facility in Columbia, Missouri. Completed plans call for the renovation of a power facility.

SCOPE OF WORK a. The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (5) Demolition shall consist of: (a) Existing Turbine Generator 6, its condenser, and related equipment (b) Piping SC - 3 (c) Structural Steel (d) Concrete Pads (e) Miscellaneous electrical including existing lighting, out-of-service cables, raceway, and devices. (f) A hazardous material survey has been conducted in the project work area. Refer to the survey report provided as a reference document for findings. (g) Some asbestos containing material was discovered in the project area, however, it is not anticipated asbestos containing material will be disturbed during demolition or construction of this project. (h) Some RCRA metal containing materials (paint) were discovered. Some of these materials are expected to be removed for demolition and construction of this project. Refer to Division 02 for requirements. (i) Contractor shall protect equipment and operating facility during construction from weather. (6) Structural work shall consist of : (a) Existing turbine foundation modifications. (b) Equipment maintenance pads. (c) Operating floor framing modifications. (7) Electrical work shall consist of: (a) Installation of Generator 10 and related equipment (b) Existing electrical system modification. (c) Existing switchgear upgrade. (d) Installation of a new Motor Control Center. (e) Installation of a new Automatic Transfer Switch. (f) Support commissioning of electrical systems and equipment. (8) Instrumentation & Controls work shall consist of: (a) Furnish and install instruments as defined in the instrument list (b) Install and wire the Turbine Control System (c) Calibrate instruments SC - 4 (d) Support commissioning of control systems (9) Mechanical work shall consist of: (a) Installation of Turbine Generator 10 and related equipment (b) Procurement and installation of miscellaneous pumps (c) Piping (10) Major Equipment Rigging shall consist of: (a) Develop rigging plans for the installation of major components for review. (b) Develop shoring plans as required for the existing operating floor and exterior tunnels. Exhibit B includes a previous shoring plan for the tunnels located along fifth street. Contractor shall utilize this plan for locations of existing tunnels. (c) Rigging and shoring plans shall be submitted for review and approval prior to commencing work. 4. LOCATION a. Work shall be performed under this Contract on campus of the University of Missouri - Columbia, at the University Power Plant at the Northwest corner of Fifth street and Stewart street.

Award

Power Plant

$3,329,341.00

Public - State/Provincial

Renovation

230

45

10

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
38
Bidding Soon
614
All Active Projects
271
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 28, 2023

August 25, 2023

October 12, 2023

img_map_placeholder

900 E Stadium Blvd, Columbia, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.