BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Cambridge, Massachusetts. Working plans call for the renovation of a municipal facility.

Package(s) shall be labeled on the outside with the following information: RFQ for Construction Management at Risk Services, Renovation of 689 Massachusetts Avenue with CM at Risk firms name, business address, contact name, telephone number, and email address Conceptual Estimated Construction Cost: $ 8 - 9 Million Dollars Estimated Construction Duration: 18 - 24 months Statement of Qualifications being delivered via USPS may be mailed to City Hall 795 Massachusetts Ave., Cambridge MA 02139 Attn: Purchasing. Statement of Qualifications not hand delivered to the Purchasing Department may be dropped off to a grey locked drop box labeled "Purchasing" located at the rear entrance of City Hall. The box will be checked at the scheduled submission deadline. Package(s) shall be labeled on the outside with the following information: "RFQ for Construction Management at Risk Services," Renovation of 689 Massachusetts Avenue with CM at Risk firm's name, business address, contact name, telephone number, and email address. Submit Statement of Qualifications to: Statement of Qualifications being hand delivered or sent via courier (other than USPS) may be delivered to the Purchasing Department, 5 Bigelow Street, Cambridge, MA 02139 during normal business hours. Project Description: The 689 Massachusetts Avenue project is a 35,500 s.f. Building designed by William E. Chamberlain and Clarence H. Blackhall constructed in 1904. The building is limestone clad, a three-story tall beaux-arts style building structure plus a basement. The building use prior to the City of Cambridge purchase was a bank and law offices on the first floor, office spaces on the second and third floor, one half of the basement was also office space. There is also a small penthouse above the roof. In the spring of 2023 the City painted and carpeted the third floor, the eastern half of the first floor, and the office level in the basement. This work is being performed and completed in the early summer of 2023. These areas shall have city workers occupying the basement and first floor levels, the third floor is a tenant of the City. Phasing will be an essential component of this project. The City's architect is Cambridge Seven Associates (C7A). C7A has many consultants working and reporting directly to them. The City will engage a Commissioning Agent for this project. A Limited Hazardous Building Materials Inspection was performed by Fuss and O'Neil in March of 2023 and is available in this RFQ. The project design is intended to be a net-zero emissions (All electric) building and will target LEED Gold. The project may include a solar photovoltaic array and electric vehicle charging station(s). C7A is presently in the Schematic Design Phase for the interior renovations which shall include replacement of all heat pumps and control systems. There shall be interior selective demolition in all spaces including the recently carpeted and painted areas on the third, first and basement levels. The intent is to get the CMaR under contract early in the design to aid in coordinating phasing of the recently painted and carpeted occupied spaces. The CMaR shall be responsible for performing building renovations of the entire building with portions of the building occupied. The City expects to revise electrical systems as required, the HVAC renovations will occur on occupied and unoccupied sections of the building. The scope of work shall include interior building modifications, a new building security system, ADA upgrades, replacement of the third floor Fire Protection System that is presently a dry system being converted to a wet system with an added fire pump. Modifications to the existing Fire Protection system in the other portions of the building shall be to suit the redesign of the floor layouts. There shall be demolition of an existing stair from the second to third floor with an infill of the area creating additional third floor square footage. The project shall include a complete roof replacement and some exterior restoration. Elevator replacement and or modifications shall be part of the scope of work. The project shall include many other trade bidders required to complete the interior and exterior renovations. It is presently anticipated that there may be minimal sitework modifications. The City of Cambridge has staff employed as an Owners Project Manager (OPM) who will be the direct contact for the CMaR firm after execution of the contract. The City's OPM and staff shall be interfacing between the architect and CMaR firm during pre-construction services and shall be on site monitoring site work and construction from the start through final project completion of each phase. Questions from CM@R firms due by May 25, 2023 at 12:00 pm Review and short list Construction Manager at Risk RFQ, Early June 2023 o Issue Request for Proposal to prequalified Construction Manager at Risk firms June 15, 2023 o Interview prequalified Construction Manager at Risk firms that submitted proposals July 24 - July 28, 2023 o Select Construction Manager at Risk firm July 2023 o City and CM at Risk Firm enter into a Pre-construction Services Contract August 2023 o Preparation of Construction Documents April 2023 - December 2023 o Early construction packages, TBD o Trade Bids, TBD o Establish GMP - January 2024 o Construction period - January 2024 - March 2025 o Substantial Completion - June 2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Shortlist Confirmed.

Final Planning

Municipal

$9,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
545
Active Projects
340
Bidding Soon
4,277
All Active Projects
1,745
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 1, 2023

January 15, 2024

June 30, 2025

img_map_placeholder

689 Massachusetts Ave, Cambridge, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.