Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 16, 2023 at 8:00 PM
Updated January 26, 2024
Renovation of a playground / park / athletic field in Westminster, South Carolina. Completed plans call for the renovation of a playground / park / athletic field.
As of June 16,2023, solicitation was cancelled and all quotes were rejected. The main recreation building roof is approximately 3,720 square-foot; which includes the main event area and the attached maintenance shop. Currently, the building has shingles and felt laid on top of tongue and groove boards. Vendor shall remove existing shingles and felt. Inspect under felt for damaged and rotten tongue and groove boards and replace as needed with matching material and dimensions - standard 6-inch by 1-in tongue and groove boards. Quotes shall include a 100 sq. foot allowance for replacement of tongue and groove boards. A price per linear foot shall be provided on the Quote Form (page 1). Vendor shall inspect all trusses for any rot or damage. Any truss material that needs to be replaced shall be replaced with rough sewn lumber and be scabbed on both sides with rough sewn lumber. The rough sewn lumber shall match the existing dimensions of existing. Quotes shall include a 100 linear foot allowance for truss repair and scabbing. A price per linear foot shall be provided on the Quote Form (page 1). Add 1/2 -inch Zip Roofing System sheathing (or approved equivalent) on top of existing tongue and groove boards per manufacturer's installation directions. Install starter shingles, roof over ridge vent, and ridge caps as needed for entire building roof. Shingles shall be 30-year architectural shingles and shall be as close to original color as possible. There shall be no roofing nails visible through the tongue and groove boards. Cut overhanging deck boards flush with fasica boards with matching lumber and dimensions. Install drip edge, ice/water shield at side walls (pipe boots) and water diverter above front doors. Replace all pipe boots. Supply and install approximately 75-foot of new 8in seamless gutters on back side of main event area over porch area and place two downspouts at each end of the gutter. Downspout on the back left side of the building shall be installed from the gutter down through the porch floor to exit, as close to building as possible. Awarder vendor is responsible for cutting the hole through the porch floor. Vendor shall provide lump sum pricing, to include materials and labor, for the roof replacement of the main recreation building on the Quote Form (page 1)
Post-Bid
Playgrounds / Parks / Athletic Fields
$220,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
