BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Saint Ignace, Michigan. Completed plans call for the renovation of a military facility.

Solicitation No. 70Z03024QCLEV0084 - Floor Replacement Project for U.S. Coast Guard Station St. Ignace Housing Units Provide all labor, material, equipment, transportation, and supervision required for replacing the flooring for the Station St. Ignance Housing Units. Refer to the Statement of Work for requirements. The period of performance is to be determined as housing units become available. All sites are to be completed by September 1, 2024. Refer to the Statement of Work for details. This procurement is estimated to be less than $25,000.00. The applicable NAICS is 238330 (Flooring Contractors) with a Small Business Size Standard of $19.0M. All relevant solicitation documents, including specifications and drawings will be available for download exclusively from the Internet in approximately seven days at this website. Interested parties should utilize the website's Register to Receive Notification function by registering under the solicitation No. 70Z03024QCLEV0084 THE DUE DATE FOR OFFERS WILL BE ESTABLISHED UPON ISSUANCE OF THE REQUEST FOR QUOTE. Any amendments issued to this solicitation will be posted solely on SAM.gov. Scope of Work Carpet Area - 1.1 The contractor is to remove all carpet on stairs and on the second floor along with the padding to be replaced and dispose of all materials off the USCG property at the contractor expense to an approved disposal site. 1.2 The contractor will repair or replace any damaged or loose tack strips as needed; inspect and repair the subfloor for any loose staples, screws, nails, and etc.; identify and report any water, pet staining or odors, or any other abnormal damages that may cause further damage or odors to the USCG POC before continuing work. 1.3 All flooring will need to be cleaned of all loose debris, swept and/or vacuumed, before installing any new materials. 1.4 Install any needed rubber shims to level the carpet with any other flooring in use, and install transitions to areas connecting to different flooring materials. 1.5 Install stain resistant padding and carpet following the manufacturers recommendations. 1.6 Carpet installation on stairs is to be tucked. Laminate Flooring Install - 1.7 Contractor to remove all installed carpet and padding in the downstairs area of the home. 1.8 Contractor to remove all tack strips from old removed carpet. 1.9 Contractor will remove all tile flooring to include any old flooring that previously was installed on top of, if applicable, (possibly two to three layers) in the dining area. Contractor to take all lower level flooring down to subfloor level in areas to have laminate flooring installed. 1.10 Contractor will flush cut all flooring along back and side of kitchen floor cabinetry in dining room to remove any tile or flooring in dining room without disturbing the kitchen cabinetry, flooring in kitchen area will remain along transition of kitchen entry in a clean cut manner with a transition strip to match flooring being installed. 1.11 Contractor is to fill any cracks found in subfloor work area and if necessary level subfloor in preparation of new laminate flooring installation. 1.12 Contractor will use an underlayment to the specifications listed below for an extra noise and moisture barrier between the subfloor and the laminate floor to be installed. This will be provided by the contractor. 1.13 The specific flooring to be installed is indicated below under materials, this will be provided by the contractor. 1.14 All transition strips required through the unit will be matched with the flooring installed. Minimal use of transitional strips is required per contract, if flooring can be floated through multiple rooms then install will be completed in this manner. 1.15 Install area is to include all alcoves, closets and other flooring areas in accordance with the POC guidance upon contractors walkthrough for accurate worksite measurements.

Post-Bid

Military

$25,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
25
Bidding Soon
342
All Active Projects
130
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 27, 2024

July 5, 2024

September 5, 2024

img_map_placeholder

1075 Huron St, Saint Ignace, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.