Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Mount Gilead, Ohio. Conceptual plans call for the renovation of a water / sewer project.
Project Summary Morrow County has requested financial assistance from the Ohio Water Pollution Control Loan Fund (WPCLF) for the SoMoCo WWTP Improvement project. Work for this project will primarily include the construction of a new wastewater treatment plant (WWTP), wastewater lift station, and force main sewer to correct environmental and public health issues related to runoffs of treated wastewater to surface water, and to replace a WWTP that is aged and in poor condition. Morrow County is eligible for approximately $3,070,000 in grants from various entities to help pay for this project. The remaining estimated WPCLF loan amount is $839,000. Debt for the project will be repaid from monthly sewer fees. The project is scheduled to begin in spring 2023 and be completed in 21 months. History & Existing Conditions The Southern Morrow County (SoMoCo) Wastewater Treatment Facility, constructed in 1998, primarily receives wastewater generated from commercial facilities in the area of the State Route 61 and Interstate 71 interchange. The existing system is an aerated lagoon facility rated with an average daily flow of 0.35 million gallons per day (MGD). Influent wastewater is passed through a comminutor to break up any solids in the raw wastewater. Wastewater is then transferred to two aerated lagoon cells for biological treatment and then into a storage lagoon that allows for 120 days of hydraulic retention time. Effluent from the storage lagoon passes through an ultraviolet disinfection unit before being spray irrigated on an adjacent farm field. For several years, the operation of the spray irrigation has had several concerns. Irrigation is only permitted under favorable weather conditions, which limits spray irrigation to a limited amount of the year. Even under favorable conditions, the soils present do not allow for a high infiltration rate, which can lead to ponding and runoff of treated sewage from the site; limiting the frequency that irrigation can occur. Furthermore, the existing mechanical components of the irrigation system have historically suffered from a poor operations and maintenance (O&M) program, and are beyond their useful life expectancy, causing maintenance issues. Currently the WWTP receives an average daily flow of 70,000 gallons. However, the receiving flows fluctuate season to season and, often, day to day. Tourism at nearby businesses can generate large amounts of flow during the spring and summer months. This service area is also the subject of several proposed developments. The WWTP, which was formerly privately owned, was purchased by Morrow County to allow for improvements and expansion to the plant in order to improve water quality by reducing the runoff of treated wastewater, and to allow for development in this commercial corridor of the county. Population and Flow Projections This area has been identified as a critical part of Morrow County's strategic development plan due to its proximity to Columbus and its location along Interstate 71. Residential and, in particular, commercial growth is expected to occur in the 20-year planning period and has thus far been limited due to the condition of the existing WWTP. The WWTP is currently underperforming due to age and maintenance issues and is also impacting surface water due to runoff of spray irrigated, treated wastewater. The new WWTP has been designed to expand the capacity of the treatment system to manage existing and project flows in the service area, with a maximum design flow of 0.43 million gallons per day (MGD) and an average flow of 0.145 MGD.
Conceptual
Water / Sewer
$3,070,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 19, 2023
Multiple Locations, Mount Gilead, OH
Related To This Project
Mount Gilead, OH
Bid Date: Jul 17 2023
Mount Gilead, OH
Bid Date: Feb 05 2024
Mount Gilead, OH
Bid Date: Sep 16 2021
Mount Gilead, OH
Bid Date: Dec 13 2018
Mount Gilead, OH
Bid Date: Sep 26 2023
Mount Gilead, OH
Bid Date: Dec 20 2021
Mount Gilead, OH
Bid Date: Feb 14 2022
Mount Gilead, OH
Bid Date: Mar 16 2022
Mount Gilead, OH
Bid Date: May 05 2023
Mount Gilead, OH
Bid Date: Aug 04 2023
Mount Gilead, OH
Bid Date: Feb 22 2023
Mount Gilead, OH
Bid Date: Feb 13 2023
Mount Gilead, OH
Bid Date: Sep 21 2022
Mount Gilead, OH
Bid Date: Aug 19 2022
Mount Gilead, OH
Bid Date: Jul 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.