BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Olympia, Washington. Completed plans call for site work for a water / sewer project.

The general contract for replacing approximately 2,700 linear feet of 4-inch PVC or HDPE mainline and 600 linear feet of 2-inch PVC or HDPE mainline, 16 single service connections, 14 double service connections, and valves and appurtenances as noted in the scope of work. Location- 3702 Wesley Loop NW Olympia, WA 98502 The scope of work involves complete replacement of the Country Club Estates water distribution system. Distribution system replacement includes installation of approximately 600 lineal feet of 2- inch, and 2,700 lineal feet of 4-inch water main, along with 16 single services, 13 double services, 2-each meter setter sample stations, 4 each 4-inch valve assemblies, 1 each 2 inch valve assembly, 3 each 2-inch blow off assemblies, and 1 each air vac assemblies as noted in plans and specifications. 4-inch DR 18 AWWA C900 or 2-inch ASTM D2241 SDR 21 (class 200) gasketed PVC pipe shall be used per drawings; alternatively, minimum AWWA C906 SDR11 HDPE pipe may be used. Service assembly replacements shall include replacement of the service laterals. Drilling shall be used under all paved surfaces; open trenching is allowed outside of paved areas but requires full restoration of all public and private improvements. For more information call Kim Gubbe at (360) 357-8783 ext. 125 or kgubbe@thurstonpud.org. The District shall have the right to reject any or all bids not accompanied by bid security or data required by the bidding document or a bid in any way incomplete or irregular. All applicants must have a Unique Entity Identifier (UEI) number to submit a bid including subs. The District is an equal opportunity and affirmative action employer. Small, Minority- and Women-Owned Businesses are encouraged to submit bids. All work performed on the project will be subject to the higher of the prevailing state or federal wage rates. Project shall be completed within 180 calendar days Construction 10% MBE 6% WBE Supplies 8% MBE 4% WBE Equipment 8% MBE 4% WBE Purchased Services 10% MBE 4% WBE

Award

Water / Sewer

$378,539.00

Public - City

Site Work

6

13

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
27
Bidding Soon
673
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2023

July 10, 2023

img_map_placeholder

3702 Wesley Loop NW, Olympia, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.