BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.

The Contractor will install green infrastructure and other site improvements under I-94 at W. Becher Street. The work includes, but is not limited to, site grading and finishing, installation of dry stream beds, bio-retention, an asphalt maintenance pathway, native vegetation, bioswales, and trees. Using PVC pipe, the contractor will connect 18 freeway downspouts to the green infrastructure. A Freeway Drainage Collection Feature is an alternative bid item. Major components of the work include:Lump Sum Excavation for dry stream beds and bio-retention area o 668 Cubic Yards Crushed Aggregate Base Course o 272 Cubic Yards Bituminous Concrete (HMA Pavement) o 859 Cubic Yards Stone Mulch Finish o 130 Each Tree - Deciduous, 1.5" Caliper Container with 2-year Warranty o 6,872 Cubic Yards Compost (Soil Amendment) Major components of the work include: 4,089 Cubic Yards Excavation for Pathway, Streambeds and Bioretention Basin 599 Cubic Yards Crushed Aggregate Base Course 158 Cubic Yards Bituminous Concrete (HMA Pavement) 694 Cubic Yards Stone Mulch Finish 130 Each Tree - Deciduous, 1.5" Caliper Container with 2-year Warranty 843 Cubic Yards Compost (Soil Amendment)

Bid Results

Roads / Highways

$1,756,319.00

Public - County

Paving, Site Work

218

18

11

12

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
122
Bidding Soon
1,979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

August 1, 2023

Project location map

W. Becher Street and IH94, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.