Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.
The Contractor will install green infrastructure and other site improvements under I-94 at W. Becher Street. The work includes, but is not limited to, site grading and finishing, installation of dry stream beds, bio-retention, an asphalt maintenance pathway, native vegetation, bioswales, and trees. Using PVC pipe, the contractor will connect 18 freeway downspouts to the green infrastructure. A Freeway Drainage Collection Feature is an alternative bid item. Major components of the work include:Lump Sum Excavation for dry stream beds and bio-retention area o 668 Cubic Yards Crushed Aggregate Base Course o 272 Cubic Yards Bituminous Concrete (HMA Pavement) o 859 Cubic Yards Stone Mulch Finish o 130 Each Tree - Deciduous, 1.5" Caliper Container with 2-year Warranty o 6,872 Cubic Yards Compost (Soil Amendment) Major components of the work include: 4,089 Cubic Yards Excavation for Pathway, Streambeds and Bioretention Basin 599 Cubic Yards Crushed Aggregate Base Course 158 Cubic Yards Bituminous Concrete (HMA Pavement) 694 Cubic Yards Stone Mulch Finish 130 Each Tree - Deciduous, 1.5" Caliper Container with 2-year Warranty 843 Cubic Yards Compost (Soil Amendment)
Bid Results
Roads / Highways
$1,756,319.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 8, 2023
August 1, 2023
W. Becher Street and IH94, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Jul 12 2023
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Jun 02 2023
Milwaukee, WI
Bid Date: Jun 06 2023
Milwaukee, WI
Bid Date: Nov 29 2018
Milwaukee, WI
Bid Date: Jun 09 2023
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Nov 01 2023
Milwaukee, WI
Bid Date: May 30 2023
Milwaukee, WI
Bid Date: Jan 26 2023
Milwaukee, WI
Bid Date: Dec 29 2022
Milwaukee, WI
Bid Date: May 10 2023
Milwaukee, WI
Bid Date: Jun 16 2023
Milwaukee, WI
Bid Date: Jun 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.