Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Portland, Maine. Completed plans call for site work for a water / sewer project.
The work shall generally consist of, but is not necessarily limited to, 1. Installation of approximately 950 feet of 8-inch PVC water main, 2. Installation of temporary water main and other related appurtenances along the water main. Each proposal must be accompanied by Proposal Guaranty in form of certified check or bid bond in amount of five percent (5%) of the total amount of the bid. A performance bond in an amount equal to one hundred percent (100%) of the contract price, and labor and material payment bonds in like amount will be required prior to execution of the Agreement. Bidder agrees to begin and complete work with the time frame outlined in the Agreement. The Bidder is responsible for determining if there are Addenda to the Project by viewing the P.W.D. project website located at www.pwd.org/construction-bids. The bidder is responsible for incorporating addenda into their Bid and referencing the number and date on Article 3 - Bidder's Representations of the Bid form. The Portland Water District will not post Bid Addenda any later than two (2) days prior to the bid opening without individually notifying all plan holders. No bids may be withdrawn within sixty (60) days after date of opening thereof. Right is reserved to refuse or reject any or all bids or to waive any informality in proposals received and to award work at the discretion of the General Manager acting in the best interests of the Portland Water District. SCOPE Furnish all labor, materials, equipment and incidentals necessary to perform all installation, maintenance, removal and area cleanup related to sediment and erosion control work as shown on the Drawings and as specified herein. The work shall include, but not necessarily be limited to installation of silt fences, sediment traps, sediment removal and disposal, device maintenance, removal of temporary devices, temporary mulching, erosion control blanket, and final cleanup.
Award
Water / Sewer
$397,795.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 8, 2023
August 7, 2023
Multiple Locations, Portland, ME
Related To This Project
Portland, ME
Bid Date: Jun 06 2023
Portland, ME
--
Portland, ME
Bid Date: Jun 20 2023
Portland, ME
Bid Date: Jul 21 2023
Portland, ME
Bid Date: Jun 22 2023
Portland, ME
--
Portland, ME
Bid Date: Jul 20 2023
Portland, ME
--
Portland, ME
--
Portland, ME
Bid Date: May 23 2023
Portland, ME
Bid Date: May 24 2023
Portland, ME
Bid Date: May 19 2023
Portland, ME
Bid Date: May 15 2023
Portland, ME
Bid Date: May 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.