BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Batavia, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Main Street Reconstruction project from Van Nortwick Avenue westward to Randall Road. The construction improvements consist of complete reconstruction, including curb/gutter, bituminous pavement, storm sewer, lighting, bikepath and sidewalk. This roadway is a major arterial route through the city and is in need of upgrade to bring this portion of Main Street to an urban section. Phase 1 Preliminary Engineering will be completed in early 2023. Design Engineering is planned for 2023-2024 and ROW Acquisition (if needed) will be completed in 2023-2024. The actual roadway construction and any utility upgrade work is anticipated in early 2025, depending on IDOT approvals. The project is funded at a Federal 75% and Local 25% match for construction and construction engineering. The City has been approved to receive $2.34 million in STP funds (Federal Fund) for Construction and Construction Engineering. The balance of construction will be funded through Rebuild Illinois fund ($1,260,000) and Bond Fund ($4,000,000). Fiscal Years 2023-2027, As of March 14, 2024, project is in Phase II, the engineering plan preparation to be completed in 2024. Construction of the project is tentatively scheduled to start in 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$8,061,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
89
Bidding Soon
1,767
All Active Projects
758
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

Main St, Batavia, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.