Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Batavia, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Main Street Reconstruction project from Van Nortwick Avenue westward to Randall Road. The construction improvements consist of complete reconstruction, including curb/gutter, bituminous pavement, storm sewer, lighting, bikepath and sidewalk. This roadway is a major arterial route through the city and is in need of upgrade to bring this portion of Main Street to an urban section. Phase 1 Preliminary Engineering will be completed in early 2023. Design Engineering is planned for 2023-2024 and ROW Acquisition (if needed) will be completed in 2023-2024. The actual roadway construction and any utility upgrade work is anticipated in early 2025, depending on IDOT approvals. The project is funded at a Federal 75% and Local 25% match for construction and construction engineering. The City has been approved to receive $2.34 million in STP funds (Federal Fund) for Construction and Construction Engineering. The balance of construction will be funded through Rebuild Illinois fund ($1,260,000) and Bond Fund ($4,000,000). Fiscal Years 2023-2027, As of March 14, 2024, project is in Phase II, the engineering plan preparation to be completed in 2024. Construction of the project is tentatively scheduled to start in 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$8,061,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
Main St, Batavia, IL
Related To This Project
Batavia, IL
Bid Date: Apr 16 2024
Batavia, IL
Bid Date: Apr 03 2024
Batavia, IL
Bid Date: Apr 03 2024
Batavia, IL
Bid Date: Mar 21 2024
Batavia, IL
Bid Date: Mar 20 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.