Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Saint Paul, Minnesota. Completed plans call for the renovation of a educational facility.
Extent of testing, adjusting, and balancing (TAB) work required by this Section is indicated on drawings and schedules, and by requirements of this Section; and is defined to include, but is not necessarily limited to air distribution systems and associated equipment and apparatus of mechanical work. The work consists of periodic site visits to observe and report on the mechanical systems installation, setting speed and volume (flow) adjusting facilities provided for systems, recording data, conducting tests, preparing and submitting reports, and recommending modifications to work as required by contract documents. 1. Prior to construction, take measurements of air flow rates for each VAV box serving the area of remodeling, with the VAV boxes at their maximum open positions. Record these CFMs and send this information to the Architect/Engineer. 2. When it is substantially complete, test, adjust, and balance the air handling system VAV boxes, ductwork, and supply diffusers. Work of this Section shall be coordinated with work of all other sections and shall be scheduled in a timely manner to avoid causing delays in Substantial Completion of the project. B. Effort has been made to provide balancing dampers and balancing valves in ductwork and piping systems. The contractor providing TAB services shall review the plans for dampers and valves necessary for balancing the systems and shall include in their bid (and provide) additional valves and dampers as they deem necessary to achieve balanced systems. Interior remodeling to renovate 8,175 SF of the lower level of the New Main building on the main campus of Metro State University. The renovation will include updating of HVAC, electrical power, and lighting and technology systems.
Award
Educational
$1,085,800.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2024
April 8, 2024
700 E 7th St, Saint Paul, MN
Related To This Project
Saint Paul, MN
Bid Date: Jun 08 2023
Saint Paul, MN
Bid Date: May 30 2023
Saint Paul, MN
Bid Date: May 23 2023
Saint Paul, MN
Bid Date: Jun 20 2023
Saint Paul, MN
Bid Date: Jun 07 2023
Saint Paul, MN
Bid Date: Jun 07 2023
Saint Paul, MN
Bid Date: Jun 08 2023
Saint Paul, MN
Bid Date: Jun 01 2023
Saint Paul, MN
Bid Date: Jun 13 2023
Saint Paul, MN
Bid Date: Jun 01 2023
Saint Paul, MN
Bid Date: May 17 2023
Saint Paul, MN
Bid Date: May 17 2023
Saint Paul, MN
Bid Date: Jun 06 2023
Saint Paul, MN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.