BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sioux City, Iowa. Conceptual plans call for site work for a water / sewer project.

Two 72" corrugated metal pipes located in Pulaski Park are deteriorating and in need of replacement. The pipe failures have resulted in sink holes surrounding the pipe and stormwater backups in the system during heavy rain events. Additionally, the existing stormwater drainage ditch is experiencing erosion problems. This project will cover the cost of removing the two 72" corrugated metal pipes and construction of a combination of green infrastructure where possible and pipe replacement where necessary. Three options have been proposed in a report by JEO Consulting Group. Option no. 1 includes removing the existing pipes and upsizing to accommodate increased stormwater flows, reconstruction of the existing drainage ditch to eliminate erosion problems within the channel, and a newly paved parking lot. This is the most expensive scenario at $3.3 million. Option no. 2 incorporates a combination of green infrastructure where feasible and concrete pipe where necessary. Green infrastructure in this scenario would include replacing the southern-most field with a constructed wetland system, reconstruction of the existing drainage ditch to eliminate erosion problems within the channel, and a newly paved parking lot. The cost for option no. 2 is estimated at $2.91 million. Option no. 3 incorporates all elements of option no. 2 with the addition of rotating fields 2 and 3 for increased green space and improved field access. Option 3 is estimated at $2.95 million. All cost estimates include design, construction, and contingency. Options 2 and 3 have the added benefit of features that improve water quality and may be eligible for water quality focused grant funds or Sponsored Project funds. Staff recommends option no. 3 be implemented through a three-part phased approach over a period of three years. This workplan is subjective and is subject to change based on observations from Environmental Services and other department staff as well as other nearby infrastructure projects in the vicinity. It allows Environmental Services to work with other departments to find the best option for the City. Year 1: removal of the south 72" CMP and construction of a wetland to accommodate increased stormwater flows. Year 2: restoration of the existing stream channel to eliminate erosion. Year 3: replacement of the north 72" CMP and construction of a new parking lot. Completion of this project will remove failing infrastructure, improve drainage in this watershed, contribute to improved water quality, and would overall improve Pulaski Park. Replacement of the south 72" pipe was originally budgeted in CIP 549-101, Annual/Emergency Storm Sewer, however staff felt it best to create a separate project as the scope has grown. This project is included in the fy 2024-2028 Capital Improvement Program. As of May 17, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

Conceptual

Water / Sewer

$1,308,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
17
Bidding Soon
202
All Active Projects
72
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2026

img_map_placeholder

2400 Vine Ave, Sioux City, IA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.