BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Alna, Maine. Completed plans call for site work for a bridge / tunnel.

As of June 23, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The Town of Alna is accepting bids for grading and ditching along both sides of Hollywood Boulevard in Alna (approximately 5808 feet/1.1 miles, total road length). Work to be performed within 60 to 90 days of award. The successful bidder shall furnish all labor and equipment required to conduct all work satisfactorily, safely, and in accordance with the specifications below. (Materials to be purchased separately by the Town of Alna.) Questions should be addressed by email to alnaclerk@gmail.com. Answers and any required updates or corrections will be posted to the "Requests for Proposals and Bids" menu on the Town website. Contractors are encouraged to check for such updates prior to submitting final bids. Proposals will not receive consideration unless submitted in accordance with the following instructions for Bidders. The Select Board will render its award decision at its next regular meeting on June 15, 2023. The Town reserves the right to accept or reject any or all proposals in whole or in part and to waive any informality the Town may determine necessary. The Town also reserves to itself the exclusive right to accept any proposals when it is deemed by the Town to be in its best interest. The Contractor shall have and maintain liability insurance that is in force until the work is completed and accepted by the municipality with the limits specified below, with the Town of Alna listed on each as an Additional Insured: o Certificate of Insurance with general liability coverage with limits no less than $1,000,000; automobile insurance with limits no less than $1,000,000, and o Workers' compensation coverage in accord with State of Maine laws in effect The Contractor shall furnish, to the municipality, certificates of insurance policies described above prior to commencement of work, and within two weeks of notice to the Contractor of the acceptance of its offer. The failure to provide this certificate will constitute a breach of the Contract and may, in the discretion of the municipality, result in termination of the Contract. The Contractor shall furnish to the Municipality a copy of an insurance policy prior to commencement of work, and within one month of notice to the Contractor of the acceptance of its offer. To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the Municipality, and its agents, and employees against all claims, damages, losses, and expenses, including, but not limited to, attorneys' fees arising out of or resulting from the performance of the work regardless of standard of care. This indemnification extends to all costs and all attorneys' fees incurred by the Municipality. The Municipality shall have up to a maximum of 30 days from date of bid opening to accept an offer. Each bid should include the following: o Firm fixed price to remove and replace six existing culvert pipes (three metal and three plastic, whose locations have been marked with white paint and stakes) with 18-inch smooth-bore, plastic culvert pipe to be supplied by the Town of Alna according to the specification, as well as all specified ditching, shoulder, and road grading. o Firm fixed price for ditching and shoulder work. o Firm fixed price for delivering and spreading gravel (assuming that gravel is purchased from the Whitefield pit of Crooker Construction, Inc.) o Total estimated yards of gravel to be purchased by the Town of Alna o Beginning at the end of the pavement, approximately 0.4 miles from the intersection with SR-194 (Head Tide Road), and continuing approximately 1.1 miles to the Whitefield Town line (marked with pink flagging tape on both sides of road), establish or re-establish ditches and shoulders, as necessary to achieve and maintain appropriate drainage of water away from the road surface, according to the following specifications. o Where possible, good quality, relatively clean gravel and stone that may have been pushed into existing ditches should be pulled back into the roadway to minimize the amount of new gravel that will be required to re-establish a crown on the road. o After ditches and shoulders have been established, apply fresh 3/4 -inch-minus gravel, as necessary to re-establish crown, so that road surface slopes 4% to each side. (Gravel to be purchased by Town of Alna, but delivered and applied by contractor.) o Replace and re-set six existing marked culverts (to be supplied by the Town of Alna) with 18- inch, smooth-bore, plastic pipe so that water on the uphill side is no longer retained, and flows freely beneath the road to the lower side.

Post-Bid

Bridges / Tunnels

$624,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
971
All Active Projects
251
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 1, 2023

July 3, 2023

img_map_placeholder

716 Hollywood Blvd, Alna, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.