Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Fresno, California. Contact the soliciting agency for additional information.
Bid Bond Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q&A No Services will include preparation of necessary plans, specification, estimates, corner cuts, document preparation and conducting necessary utility coordination for the project. The utility coordination includes, but is not limited to, submitting necessary applications, positive identification to confirm design conflicts and resolving potential utility conflicts. In general: o Coordinate meetings with City staff and stakeholders as needed. o Prepare and maintain a design delivery schedule to meet Design Completion Date of August 2024. Prepare and maintain design scope, budget, quality and schedule and provide a monthly project status report. o Prepare utility notification letters and/or applicable documents to utilities and agencies as needed to begin utility relocations and/or Civil work. o Preparation of utility communication log to be completed and updated with every submittal, or upon request of City Project Management Team. o Conduct site investigations as needed to produce accurate design documents. o Identify additional topographic survey requirements for City Survey team to perform survey and for the consultant to process City provided topographic survey information. o Prepare and develop a conceptual traffic control plan. o Prepare and provide pothole exhibit based on utility research and engineers' recommendation showing potential utility conflicts. o Provide Geotechnical testing. o Prepare and have Geometrically Approved Drawing (GAD) of project approved, including specifications and engineer's estimate. o Prepare construction plans, technical specifications, and construction cost estimates at each phase of work identified in the consultant agreement to meet City of Fresno and Specifications. o Submit construction documents for review to City offices, utilities/agencies, and obtaining final signatures on construction documents. o As part of the bidding phase, attend the pre-bid conference, prepare addenda and clarifications as needed, and attend bid opening. o As part of the construction phase and General construction contract administration, attend the pre-construction conference, review shop drawings, and other contractor submittals, provide clarification of construction documents during construction, review and provide technical information for construction contract change order requests if necessary, and perform as many as two site visits during construction. o Prepare record drawings documenting the as-built improvements, have as-built approved, and both Mylars and final CAD drawing provided to City. Services will include preparation of necessary plans, specification, estimates, corner cuts, document preparation and conducting necessary utility coordination for the project. The utility coordination includes, but is not limited to, submitting necessary applications, positive identification to confirm design conflicts and resolving potential utility conflicts. In general: o Coordinate meetings with City staff and stakeholders as needed. o Prepare and maintain a design delivery schedule to meet Design Completion Date of August 2024. Prepare and maintain design scope, budget, quality and schedule and provide a monthly project status report. o Prepare utility notification letters and/or applicable documents to utilities and agencies as needed to begin utility relocations and/or Civil work. o Preparation of utility communication log to be completed and updated with every submittal, or upon request of City Project Management Team. o Conduct site investigations as needed to produce accurate design documents.o Identify additional topographic survey requirements for City Survey team to perform survey and for the consultant to process City provided topographic survey information. o Prepare and develop a conceptual traffic control plan. o Prepare and provide pothole exhibit based on utility research and engineers' recommendation showing potential utility conflicts. o Provide Geotechnical testing. o Prepare and have Geometrically Approved Drawing (GAD) of project approved, including specifications and engineer's estimate. o Prepare construction plans, technical specifications, and construction cost estimates at each phase of work identified in the consultant agreement to meet City of Fresno and Specifications. o Submit construction documents for review to City offices, utilities/agencies, and obtaining final signatures on construction documents. o As part of the bidding phase, attend the pre-bid conference, prepare addenda and clarifications as needed, and attend bid opening. o As part of the construction phase and General construction contract administration, attend the pre-construction conference, review shop drawings, and other contractor submittals, provide clarification of construction documents during construction, review and provide technical information for construction contract change order requests if necessary, and perform as many as two site visits during construction. o Prepare record drawings documenting the as-built improvements, have as-built approved, and both Mylars and final CAD drawing provided to City. The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 23, 2023
2600 Fresno St, Fresno, CA
Related To This Project
Fresno, CA
Bid Date: Jul 28 2023
Fresno, CA
Bid Date: Feb 13 2024
Fresno, CA
Bid Date: May 30 2023
Fresno, CA
Bid Date: Jul 11 2023
Fresno, CA
Bid Date: Jul 11 2023
Fresno, CA
Bid Date: Jun 06 2023
Fresno, CA
Bid Date: Dec 03 2019
Fresno, CA
Bid Date: Aug 01 2023
Fresno, CA
Bid Date: Jun 20 2023
Fresno, CA
Bid Date: Jun 06 2023
Fresno, CA
--
Fresno, CA
Bid Date: May 23 2023
Fresno, CA
Bid Date: Jun 01 2023
Fresno, CA
Bid Date: May 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.