BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Ypsilanti, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000320238 Questions are submitted online No Odor control system improvements will generally include removing the existing sodium hypochlorite and sodium hydroxide bulk chemical storage tanks, chemical metering pumps, piping, valves, instruments, controls, appurtenances and associated electrical equipment and installing new; installing new process mechanical equipment, electrical gear, instruments and controls associated with the chemical scrubbing units used for odor control; installing new building heating and ventilating system equipment for the entire odor control building; installing new removeable panels in the exterior walls of the odor control building to facilitate the installation of the new bulk chemical storage tanks; installing new electrical equipment and gear on a new reinforced concrete pad on the exterior of the odor control building; and other miscellaneous architectural, structural, process mechanical, plumbing, fire alarm, and electrical construction work. The project also include the rehabilitation of the existing influent well at the facility. The existing influent well receives and collects all raw sewage that flows into the wastewater treatment facility. The existing influent well is a steel reinforced cast-in-place concrete structure with a paneled cover system to contain odors within the structure. The concrete and steel reinforcement is deteriorated and the principle construction work at the influent well involves removing deteriorated, weak concrete and corroded reinforcement steel to resilient surfaces and installing new reinforcement steel and cast concrete to restore the structural integrity of the influent well. A new cover system with several pipe penetrations will also be installed on top of the influent well. To allow for the construction work to be performed inside the influent well, the Contractor must construct and install a temporary bypass system around the existing influent well and maintain this bypass throughout the duration of construction. This temporary bypass is essential to maintain YCUA's ability to collect and treat raw sewage during the construction project. The project also involves installing new sump pumping units, discharge piping, pipe insulation, pipeline heat tracing, and associated instruments, controls and electrical to convey air scrubber discharge wastewater from the building basement sump to the above-grade, outdoor grit tanks. Buyer's Requirements General Requirements - Certified Payroll - Contractors License Required - Installation Required - Insurance Required - Material Safety Data Sheets Required - Prevailing Wage Required - Safety Standards Plan Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % Bids will not be accepted from Bidders that do not attend the mandatory pre-bid conference and mandatory site tour following the pre-bid conference. Personal protective equipment (PPE) is required for the site tour that immediately follows the pre-bid conference. The required PPE includes OHSA-approved safety shoes, hard helmet and safety glasses. - Payment Bond 100 %

Bid Results

Water / Sewer

$7,998,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
99
Bidding Soon
1,469
All Active Projects
611
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2023

August 14, 2023

img_map_placeholder

2777 State St, Ypsilanti, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.