Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a medical facility in Las Vegas, Nevada. Completed plans call for the renovation of a 12,450-square-foot, one-story above grade medical facility.
A. Summary Project Description: The Anti-Ligature & Unit Hardening project at the Desert Willow Treatment Center includes removal and replacement of existing ceilings, walls, and fixtures with the objective of eliminating ligature points throughout the facility, as well as providing impact-resistant ceilings and walls to reduce the amount of damage caused by the facilitys patients. The project work is divided between five prototypical care units, patient restrooms within each unit, additional patient restrooms adjacent to corridors and classrooms, a kitchenette within one of the care units, and the main entry vestibule. B. Contract Scope: Demolition and Construction. C. Contract Terms: Lump sum (fixed price, stipulated sum). Base Bid Description: 21-M02-20 - HVAC Replacement. This project will replace six air handling units and ninety-one fan coils at the Desert Willow Treatment Center. Four air handling units are on the roof and two air handling units are on a mezzanine serving the gymnasium. The ninety-one fan coils are located above the ceiling grid throughout the facility. 22-A012 & 23-A005 - This project will design and construct impact resistant wall protection and hardened ceiling assemblies at the dormitory hallways and dayrooms in the Desert Willow Treatment Center at the Southern Nevada Child and Adolescent Services campus. This project will also rehabilitate the patient bathrooms of the Desert Willow Treatment Center to create solid surface seamless showers, install new wall and floor finishes, and replace plumbing fixtures. This project will also harden an open kitchenette, replace unit entry doors, and replace the front entry door with a sliding door assembly. Base Bid Description: 21-M02-20 - HVAC Replacement. This project will replace six air handling units and ninety-one fan coils at the Desert Willow Treatment Center. Four air handling units are on the roof and two air handling units are on a mezzanine serving the gymnasium. The ninety-one fan coils are located above the ceiling grid throughout the facility. 22-A012 & 23-A005 - This project will design and construct impact resistant wall protection and hardened ceiling assemblies at the dormitory hallways and dayrooms in the Desert Willow Treatment Center at the Southern Nevada Child and Adolescent Services campus. This project will also rehabilitate the patient bathrooms of the Desert Willow Treatment Center to create solid surface seamless showers, install new wall and floor finishes, and replace plumbing fixtures. This project will also harden an open kitchenette, replace unit entry doors, and replace the front entry door with a sliding door assembly. Contract Time: 366 calendar days. Liquidated Damages: $2,000.00 per day. Prevailing Wages must be paid on this project. Project Address: 6171 West Charleston Boulevard, Las Vegas The estimated construction cost for the base bid of this project is: $6,386,555.00
Award
Medical
$6,212,337.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2023
November 13, 2023
6171 W Charleston Blvd, Las Vegas, NV
Related To This Project
Las Vegas, NV
--
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Jun 15 2023
Las Vegas, NV
--
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Jun 29 2023
Las Vegas, NV
Bid Date: Jun 14 2023
Las Vegas, NV
Bid Date: May 26 2023
Las Vegas, NV
Bid Date: Oct 10 2024
Las Vegas, NV
Bid Date: Oct 24 2023
Las Vegas, NV
Bid Date: Jun 13 2023
Las Vegas, NV
Bid Date: Jun 20 2023
Las Vegas, NV
Bid Date: May 23 2023
Las Vegas, NV
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.