Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Concord, North Carolina. Conceptual plans call for site work for a water / sewer project.
The City of Concord provides water and/or electric service to a population of approximately 108,000 residents. There are approximately 46,000 water and 34,000 electric services. The City has experienced steady growth over the last decade. This growth is expected to continue; thus expandability of a potential AMI solution is an essential concern. The City's service areas for water and electric service vary greatly, so there are current and future service areas that will have water service only and do/will have an alternate electric utility provider. The City's approximately 45,000 existing water meters include residential, commercial, and industrial meters ranging from 3/4 -inch to 10-inch. For 2-inch and smaller, the City's current preferred meter is Badger. For 3-inch and larger, the City's preferred meter is the Octave. While not essential, it is generally preferred to utilize these assets with the new AMI system. However, meter age and new meter warranty will be a consideration as well. The following scope of work is currently envisioned for this project. The intent is to award the entire scope to one qualified firm or team of firms; however, the City reserves the right to contract separately for any portion of the project. This may include issuing a subsequent RFQ for certain tasks or assigning tasks to the City's on-call firms. By issuing this RFQ, the City is seeking a partner to determine the best path forward towards improving its business and finding ways to utilize current and future technologies to achieve that goal. Part of the scope that will be expected of the selected consultant will be to further identify and refine our goals prior to issuance of an RFP for an AMI vendor. Generally, the City's goals of implementing an AMI system are listed below: Improve customer service and customer experience Increase billing process efficiency Improve planning capabilities Improve system monitoring Improve asset performance Accurately quantify and reduce system losses Ensure future and backwards compatibility and minimize risk of obsolescence Implementation of Meter Data Management (MDM) system The project, and consultant proposals, will be defined by three phases. At the completion of each phase,the project and selected consultant will be evaluated, and a determination will be made by the City whether to proceed to the next phase with the selected consultant. The project phases as currently envisioned are described below. Note that this is not intended to be all-inclusive, nor is it guaranteed that all the below tasks will be utilized. A more detailed Scope of Work will be developed during negotiation with the selected consultant. Deadline for Vendor Questions to be submitted to the City May 15, 2023 The City reserves the right to reject any or all responses or delete any portion of the response, or to accept any response deemed most advantageous, or to waive any irregularities or informalities in the response received that best serves the interests and at the sole discretion of the City
Conceptual
Water / Sewer
$931,616.00
Public - City
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2024
Multiple Locations, Concord, NC
Related To This Project
Concord, NC
Bid Date: Jun 21 2023
Concord, NC
Bid Date: Jun 21 2023
Concord, NC
Bid Date: Jun 28 2023
Concord, NC
Bid Date: Jun 22 2023
Concord, NC
Bid Date: Jun 15 2023
Concord, NC
Bid Date: Aug 02 2023
Concord, NC
Bid Date: Jun 27 2023
Concord, NC
Bid Date: Jun 08 2023
Concord, NC
Bid Date: Jun 07 2023
Concord, NC
Bid Date: Aug 26 2024
Concord, NC
Bid Date: May 23 2023
Concord, NC
Bid Date: May 12 2023
Concord, NC
Bid Date: Apr 23 2015
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.