BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Pullman, Washington. Working plans call for the renovation of a 41,500-square-foot educational facility; and museum.

Per the owner, as of February 8, 2024, a design/build team has been selected. The owner states that construction is expected to begin in mid-May 2024. Washington State University Request for Qualifications For Design Build Services Eastlick-Abelson-Bustad Renovations Pullman, WA. Statements of Qualifications Submittals will be received by Washington State University, Facilities Services, from firms interested in providing Progressive Design-Build services for renovating 41,500 square feet of space to Bustad, Eastlick and Abelson halls on the Pullman campus of Washington State University. Washington State University is seeking a design-build partner who is committed to collaboratively developing a unique and tailored solution with the University stakeholders. The University is seeking a team which can develop a thoughtful, meaningful, functional, solution which serves all the program needs and strengthens the campus. The goal of the WSU progressive design-build process is to work with a committed team of skilled designers and builders to develop this project. The design-build team must be sufficiently familiar with the project parameters such that they are able to commit to achieving the programmatic goals working with the University team. WSU is not seeking a developed solution through the RFQ and RFP process, but rather is seeking a team with whom we can collaborate and develop the most successful building solution that meets the needs of the program. WSU is seeking teams who demonstrate a very clear understanding of the distinction between an immediate DesignBuild solution versus a commitment to a process of exploration. The project is located within three buildings Eastlick Hall - 300 NE Veterans Mall, Pullman WA 99164 Abelson Hall - 205 NE Library Mall, Pullman WA 99164 Bustad Hall - 1845 E Grimes Way, Pullman WA 99164 The interior renovation in Eastlick Hall will primarily be teaching labs for the School of Biological Sciences. Abelson Hall will include interior renovation for Research Labs. Renovation for the College of Veterinary Medicine will occur in Bustad Hall, for both Teaching labs and Simulation Laboratory with support spaces. The DB team will assist WSU in determining the infrastructure updates in each building to support the research space renovations. The Eastlick and Abelson Halls project includes a small renovation in Bustad Hall, and is approximately 33,040 sf. The Bustad Hall Simulation Lab project is approximately 8,432 sf. The Guaranteed Maximum Price (GMP) Design-Build budget for this Project will be $21,862,000 ($16,468,000 for the Eastlick-Abelson-Bustad portion of the Project and $5,394,000 for the Bustad Simulation Laboratory portion of the Project). The GMP shall include all design and construction costs, contingencies, indirect and reimbursable expenses, and fees to complete the Project. The GMP does not include Washington state sales tax, see Section 00 50 00 - Agreement between Owner and Design-Builder. All questions regarding this Design-Build Procurement shall be addressed to Joanie Thomas, Project Manager, thomasjl@wsu.edu.

Pre-Construction/Negotiated

Museum

$21,862,000.00

Public - State/Provincial

Renovation

14

10

92

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
2
Bidding Soon
127
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

May 15, 2024

img_map_placeholder

Multiple Locations, Pullman, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.