BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 16, 2023 at 8:00 PM

Updated June 21, 2025

Site work for a mixed-use development in New York, New York. Completed plans call for site work for a road / highway.

Provide new PID CCTV System and MVM surveillance CCTV system at the mezzanine level. Total of 30 cameras including 10 MVM and 20 PID cameras. 7 turnstiles which will be replaced by wider (30inch) turnstiles. Installation of a mechanical HVAC and Ventilation System for the existing Communications Room and other fire alarm enhancements to the current Communications Room conditions to support the new CCTV system. This is an A + B Bidding Contract Est $ Value: $1M - $5M

Post-Bid

Transportation Terminals

$5,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
983
Active Projects
498
Bidding Soon
7,530
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2023

July 21, 2023

Project location map

Archer Ave & Sutphin Blvd, New York, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.