BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Appleton, Wisconsin. Completed plans call for the renovation of a detention facility.

Scope of Service Reference the document titled "Existing Heatcraft Refrigeration System" for details on the existing refrigeration system and equipment layout. The Heatcraft unit to be replaced is highlighted in green on the 1st page of the document. The new replacement units shall be like for like units matching the sizing, capability and functions of the existing units. The following shall be included in the scope of work: Work shall be scheduled with the County at least two weeks prior to starting work so food inventories and kitchen operations can be scheduled around the equipment outages. Replacement of this unit must be completed within a 3 day period in order to limit disruption to the kitchen operations. If needed, the refrigerant lines can be run prior to the 3 day refrigeration system shutdown, however the cooler shall not be down for more than 3 days. The refrigeration lines above kitchen area must be installed before 9 am or after 7 pm as noted in section 5.0. New equipment shall include completely new cooling systems including the outdoor condenser/compressor units and controls, refrigerant lines, evaporator units and lockable thermostat controls with vandal resistant guards within the walk in units. The outdoor units must be designed for cold weather operation. New equipment shall at a minimum include all features that the existing units have. Acceptable manufactures for equipment shall include RDI systems, Heatcraft or other equivalents with approval from the County. New equipment shall have an equal or greater rating than the existing equipment, however all new equipment must be compatible with the County's existing electrical system which is outlined in the attached drawings. Contractor is not responsible to the wiring or electrical connections to the units. Outagamie County will be responsible for coordinating and performing electrical wiring and connections. Refrigerant lines must be insulated as required and all equipment must be installed per manufactures recommendations and specifications. The existing concrete pad can be used for the exterior unit, however if a larger pad is required the contractor shall provide and install the larger pads as part of the project. Outdoor units must be fastened to the pads and must fit within the available space. Walk in unit is located in the kitchen on the Ground floor of the Justice Center. There is elevator access to the kitchen area. The kitchen area is a corrections type of area with food prep and laundry being performed by inmates throughout the day. Vendor must follow all corrections security and safety when working within the kitchen area. Contractor shall be responsible for any required permits and for following all local codes. Site clear all demoed equipment and materials on a daily basis. Provide a one year parts and labor warranty on overall system and a 5 year warranty on the compressors.

Award

Jails / Prisons

$25,422.00

Public - County

Renovation

3

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
17
Bidding Soon
340
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2023

June 29, 2023

img_map_placeholder

320 S Walnut St, Appleton, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.