BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a medical facility in Houston, Texas. Completed plans call for site work for a medical facility.

Refurbishment of Air Handling Units at Ben Taub Hospital Phase IV for the Harris County Hospital District dba Harris Health System DESCRIPTION OF WORK A. The purpose of this Work is for the Contractor to furnish all labor, equipment, materials, and incidentals necessary to provide new components for a total of nineteen (19) existing air handling units that serve the Ben Taub Hospital, located at 1504 Taub Loop, Houston, Texas such that all specified components result in a complete and operational system in accordance with the Contract Documents. 1. Basement Equipment Room: Eight (8) air handling units AHU-B-5, AHU-B-6, AHU-B-7, and AHU-B8, AHU-B-9, AHU-B-10, AHU-B-11, and AHU-B-12. 2. Penthouse: Eleven (11) air handling units AHU-P-4, AHU-P-5, AHU-P- 6, AHU-P-7, AHU-P-8, AHUP-9, AHU-P-10, AHU-P-11, AHU-P-12, AHU-P-13, and AHU-P-14. B. Work also includes all labor, equipment, materials, and incidentals necessary to provide a new exhaust system for the grease interceptor room, also located at 1504 Taub Loop, Houston, Texas such that all specified components result in a complete and operational system in accordance with the Contract Documents. 1.2 PRE-BID MEETING A. Bidders and cooling tower subcontractor attendance at the Pre-Bid Meeting and Site Walk-through is mandatory in order to submit a Bid. Bidders and subcontractors shall check-in at the Main Hospital entrance for screening and then meet at the Facilities Engineering office in the Basement Level. 1.3 SITE INVESTIGATION A. Examination and familiarization of the project site, existing structures, and all existing conditions is the responsibility of each Bidder before the Bidder prepares and submits their Bid. B. It is understood that the Contractor has complete knowledge and understanding of all existing conditions in which the Contractor will be required to operate and be affected under the conditions of this Contract and that such understanding is included and reflected in the Bid. C. After investigating all existing conditions on the site and surrounding area, Bidders are required to compare such conditions with the Contract Documents. The Bidder should immediately notify the Owner and Engineer, in writing, of any conditions for which the requirements of labor and materials are not clear, or which there may be questions regarding the obligations of the Contract.

Post-Bid

Medical

$12,000,000.00

Public - County

Site Work

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
59
Bidding Soon
2,711
All Active Projects
1,045
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2023

August 25, 2023

img_map_placeholder

1504 Ben Taub Loop, Houston, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.