BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in West Memphis, Arkansas. Completed plans call for the renovation of a water / sewer project.

The work consists generally of an expansion of the City's existing wastewater treatment facility and will include improvements to their headworks, aeration system, final clarifiers, disinfection system, RAS/WAS pumping station, equalization basin, electrical and control system, yard piping, and all other necessary and related work to complete the project as shown on the plans and described in the specifications. The work consists generally of the expansion of an existing wastewater treatment facility from 6.3 MGD to 12 MGD. This expansion must be undertaken while the existing facility remains in operation, with limited process interruption as may be required, in full coordination with the Owner,to ensure no untreated wastewater is discharged. The work generally consists of the construction of a new influent channel with grit separation, new aeration basin distribution box, modifications to existing aeration basin including the sequential cleaning and retrofit of new aeration system and supporting structures, installation of new interconnecting aeration basin effluent piping,three new 110' diameter clarifiers,scum piping station with discharge piping, effluent piping from new clarifiers, new UV disinfection system, and new discharge piping connecting to existing effluent pumping station. Also included is the construction of a new RAS/WAS pumping station and discharge piping, new electrical and controls systems, new emergency generator, new junction structures, regrading of existing equalization basin, new equalization basin effluent pumping station, and general site grading. Included in this work will be bypass pumping as required, dewatering as required, and all other necessary and related work to complete the project as shown on the plans and described in the specifications. A certified check or bank draft, payable to the West Memphis Utility Commission, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to five percent (5%) of the total of Bid, shall be submitted with each Bid. submittal of a minimum of three (3)copies of the Bid response is required, one (1) original and two (2) copies. The West Memphis Utility Commission reserves the right to reject any or all bids in whole or in part, with or without cause; and to accept the lowest bid per location which in its judgement will be for the best interest of the West Memphis Utility Commission. Completion- 840 consecutive calendar days.

Post-Bid

Water / Sewer

$100,000.00

Public - City

Renovation

3

16

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
75
Bidding Soon
681
All Active Projects
309
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 31, 2023

June 30, 2023

October 17, 2025

img_map_placeholder

Multiple Locations, West Memphis, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.