BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a communication facility in Charlotte, North Carolina. Completed plans call for site work for a communication facility.

Work shall be performed in accordance w ith the attached specifications, draw ings, and statement of w ork. This project is being solicited as a Small Business Set-Aside. The North American Industry Classification System (NAICS) Code is 236220, and the Small Business Size Standard is $39,500,000.00. Construction project magnitude is betw een $500,000.00 and $1,000,000.00. Funds are not presently available for this contract. Currently, the Government anticipates funds w ill become available prior to but no later than midnight 30 September 2023. This action has been identified on the National Guard priority list for aw ard if funds become available and the prices received are w ithin an aw ardable range. A pre-bid conference and site visit have been scheduled. See Section 00100 and Clause 52.236-27 for details. Contractors intending on submitting a bid are highly encouraged to have a representative at the pre-bid conference and site visit. In accordance w ith FAR clause 52.228-1 Bid Guarantee, a bid bond is required w ith the bid. Aw ard w ill be made to the responsible bidder w hose bid conforms to the invitation for bids and is most advantageous to the Government considering only price and price related factors. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DESCRIPTION OF THE PROJECT: The 145 th Airlift Wing in Charlotte, NC has a requirement for a construction project to extend communications duct bank in 3 areas of the base subject to the availability of funds. This project includes but is not limited to: Area 1: Approximately 145 LF of new communications duct bank. Area 1 will require the removal and replacement of approximately 515 SF of asphalt, 225 SF of heavy-duty concrete and 12 LF of curb and gutter. Area2: Approximately 545 LF of new communications duct bank, including approximately 30 LF of vertical duct bank that runs down an existing retaining wall. Area 2 will require the removal and replacement of approximately 1,980 SF of asphalt, 6 LF of curb and gutter, and 8 LF of guardrail. Area 3: Approximately, 1,385 LF of new communications duct bank and a minimum of three new communications manholes. Area 3 will require the removal replacement of approximately 545 SF of asphalt and 12LF curb and gutter. TASK ORDER NO.: W50S87-20-F-5014

Bid Results

Communication

$968,000.00

Public - Federal

Site Work

20

17

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
61
Bidding Soon
1,158
All Active Projects
486
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2023

August 14, 2023

img_map_placeholder

4930 Minuteman Way, Charlotte, NC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.