BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pre-engineered storage facility in Austin, Texas. Completed plans call for site work for a pre-engineered storage facility.

Construction Estimate at $228,000 - $240,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This is a turnkey project to provide and construct a 2,435 SF Pre-Engineered Metal Building. The scope of work includes but is not limited to site work, foundation, utility services, design, permitting and construction of a pre-engineering metal building. The general contractor shall be responsible for all design and engineering necessary to complete the building including but not limited to: Geotechnical investigations, Civil Site Design, Structural foundation design and pre-engineered metal building engineering and design in accordance with the Invitation for Bids and Contract Documents. Project Schedule: All work shall be completed within three hundred five (305) calendar days commencing on the date specified in the Notice to Proceed. This performance period includes completing the various aspects required to complete the Work, including submission of all Submittals, mobilization, procurement, installation, testing, inspection and delivery of documents described in the Uniform General Conditions, Article 12, 12.1.1.1.This site visit is not mandatory, however, TPWD strongly encourages potential bidders to view the project site and offers no guarantee that the project site will be accessible to potential bidders at any time other than the time specified in this solicitation package. Point of Contact for this Site Visit is Connor Hoelscher. He can be reached for site visit questions at 512-574-0693 or connor.hoelscher@tpwd.texas.gov. Failure to take advantage of the site visit time listed herein may result in potential bidders who are unable to visit the project site at all. Failure to give proper consideration to site conditions when preparing the bid will not constitute grounds for additional compensation. Contact Information: For technical information and information regarding administration of the contract, contact Contract Manager, Mindi Johnson mindi.johnson@tpwd.texas.gov. All questions should be submitted in writing to the mindi.johnson@tpwd.texas.gov by 5:00 PM(CT), May 31, 2023

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$217,999.00

Public - State/Provincial

Site Work

24

11

4

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
2,360
All Active Projects
920
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.