Site work for a water / sewer project in Tampa, Florida. Completed plans call for site work for a water / sewer project.

**As of September 8, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** The Hillsborough County "County" requires a Contractor to work on this project which includes repair, replacement, rehabilitation, and/or modifications to wastewater pumping stations utilized by the Hillsborough County Water Resources Department. In accordance with Hillsborough County Ordinance No. 21-17 Construction Apprenticeship Program, the bid requirements and resulting contract requires at least 12% Labor Hours. MBE (17.9%), WBE (6.9%) It is anticipated that the work to be performed under this Contract may include, but is not limited to the repair, replacement, rehabilitation, and/or modification of wastewater pump stations and/or modifications at various water, reclaimed water, wastewater facilities, and equipment utilized by the Hillsborough County Water Resources Department. Except as otherwise provided herein, the CONTRACTOR shall furnish all labor, fuel, tools, vehicles, transportation, supplies, equipment, materials, and permits to accomplish the Work contemplated in these Contract Documents in an expeditious and workmanlike manner. All pumps, discharge elbows (pump base ells) and control panels and/or RTU's shall be furnished by Hillsborough County. Hillsborough County Water Resources Department (County) owns, maintains and operates approximately 850 wastewater pump stations throughout Hillsborough County. The County intends to mechanically and electrically upgrade a varying number of pump stations each year to bring stations up to current standards. The County also is in the process of bringing existing pump stations onto an existing Supervisory Control and Data Acquisition (SCADA) system as well as upgrading existing pump stations that already have SCADA, although, a limited number of stations will be upgraded without SCADA. At stations that are being added to SCADA, the County proposes to replace the existing control panels and associated other electrical apparatus with various standard configurations of new RTU's and control panels new control panels will be manufactured by others and furnished by the County. The new control panels will be integrated into the SCADA network using cellular communication. The Contractor shall be present and shall fully support and coordinate activities with an Integrator or County operations and SCADA personnel who will be performing site inspection, loop checkout and testing, PLC programming and HMI/cellular communications configuration, and SCADA startup services for each station. These points of contact may vary during the duration of the contract. Consult with the PROJECT MANAGER for each individual Work Order Project. Demolition/Removal/Installation/Relocation: Demolition, removal, installation, and/or relocation of above and/or below grade concrete structures, asphalt, piping, valves, fittings, pipe appurtenances, pumps, pump appurtenances, fencing, electrical, miscellaneous facilities, equipment, and appurtenances. Site Work: Excavation, removal/disposal backfill, roadwork, concrete slabs, concrete walls, pipe bollards, fencing, traffic control, landscaping removal/disposal, sod removal/disposal, erosion control, and miscellaneous site work. Piping, Valves, and Fittings: Pipes, valves, fittings, and miscellaneous items above grade, below grade, and/or inside wet wells. Mechanical Equipment: Pumps, pump appurtenances, intermediate pipe supports, pump guide rail systems, pipe supports, link seal penetrations, drains, vent piping, odor control systems, and access hatches. Wastewater Wet Well Cleaning and By-Pass Pumping: Cleaning, sand and water blasting, disposal/removal of solid waste, and by-pass pumping large, high volume wastewater systems. During pump station rehab when the normal electrical and control systems are out of service each pump station will be in the complete care and custody of the Contractor

Award

Water / Sewer

$947,654.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
49
Bidding Soon
1,091
All Active Projects
445
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2023

September 26, 2023

img_map_placeholder

To Be Determined, Tampa, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.