EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 9, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Schaumburg, Illinois. Working plans call for the renovation of a water / sewer project.

Compliance with the District's Affirmative Action Ordinance Revised Appendix D, Appendix V, Appendix A, Appendix K, Appendix M and the Multi Project Labor Agreement are required on this Contract.No bids will be accepted after 11:00 A.M. (CDT) on the above scheduled due date. Faxed, mailed,emailed, or hand delivered proposals will not be accepted. There is no Bid Depository safe for this purpose. The District is seeking proposals for the implementation and maintenance of a bio-gas/natural gas co-fired combined heat and power (CHP) system to offset electricity and recover heat for the Egan Water Reclamation Plant (WRP) located at 550 South Meacham Road, Schaumburg, IL 60193. Proposals are sought from qualified contractors to design, install and maintain the equipment for five years on a turnkey, design-build basis. The estimated cost for this RFP is $10,344,000.00. The contract duration is estimated to be 550 days, not including the subsequent five-year maintenance period. The Affirmative Action Goals for the Engineering Design portion of this Request for Proposal are 20% Minority-owned Business Enterprises (MBE), 10% Women-owned Business Enterprises (WBE), and 3% Veteran-owned Business Enterprises (VBE). The Affirmative Action Goals for the Construction portion of this Request for Proposal are 20% Minorityowned Business Enterprises (MBE), 9% Women-owned Business Enterprises (WBE), and 3% Veteranowned Business Enterprises (VBE). Affirmative Actions Goals are not applicable to the maintenance portion of the contract as this is specialized work specific to the type of CHP unit(s) supplied. The Bidder agrees to fulfill the Special Training Provisions for Apprentices as specified in Appendix K and to provide training opportunities throughout the life of the contract. For the purposes of this contract, the requirements Special Training Provisions for Apprentices are 360 minority hours and 130 female hours. Proposers are advised that the District operates under a 2017 Multi-Project Labor Agreement (MPLA) with trade unions, a copy of which is provided in Appendix M. Any work done on the Egan WRP site which falls under the terms of the 2017 MPLA must be performed by appropriate union personnel. Minority and Women's Business Requirements are given in Appendix D and Appendix A. Veteran-owned Business Requirements are given in Appendix V. Plans which call for the District to be responsible for the financing of either engineering design work or construction work to be performed on District property will be required to comply with the District's Affirmative Action Ordinance with regard to utilization of MBE / WBE firms for a portion of that work. A copy of the District's Affirmative Action Policy is provided in Appendix D. No MBE / WBE utilization plan is required with this first proposal. MBE / WBE utilization plans may be required of short-listed proposers in the 'Best and Final Offer' requests. These requirements will be identified at that stage. The Contractor must use the District's online compliance monitoring system administered by the Diversity Section for payment and reporting purposes, in order to fulfill the Affirmative Action Program requirements. Further, the District assumes no liability or responsibility for the failure or inability of any Proposer to successfully download any and all contract documents, including but not limited to specifications, proposal forms and/or plans, as a result of any type of technological computer and/or software system failure or breakdown that restricts, prohibits or prevents successful downloading of any and all District contract documents by the Proposer, whether caused by the District or other parties, directly or indirectly. The District will only respond to questions received online ONE WEEK prior to the date set to receive proposals. The District will not respond to questions received after this date. The District does not guarantee the timeliness of responses provided online, nor does the District guarantee that such responses will be provided in adequate time to affect the submission of bids. The District shall provide responses online ONLY if the responses do not interpret or otherwise change the bidding documents. The District's responses online are NOT official responses and, therefore, are not binding to the bidding documents. Any official interpretation or change to the bidding documents will be made only by addenda duly issued to all plan holders on record by the Director of Procurement and Materials Management. The contact person for the request for proposal is Brian Wawczak, Senior Civil Engineer. This contact person will provide online responses to online inquiries. The District reserves the right to accept any Request for Proposal or any part thereof or to reject any and all Request for Proposals. Any questions regarding the downloading of Request for Proposal documents should be directed to contractdesk@mwrd.org or call (312) 751-6643. Shortlist Confirmed.

Final Planning

Water / Sewer

$10,344,000.00

Public - County

Renovation

65

58

6

13

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Spare Parts, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Roofing and Siding Panels, Metal Roof Panels, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Plastic Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Metal Building Systems
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Flexible Connectors, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lightning Protection for Structures, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Pruning, Watering, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Curbs and Gutters, Site Improvements, Screening Devices, Planting, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Electrical Utilities, Utility Substations, Communications Utilities, Communications Structures, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
164
Bidding Soon
2,616
All Active Projects
1,153
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2023

September 21, 2023

img_map_placeholder

550 S Meacham Rd, Schaumburg, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Biogas Combined Heat and Power System, EWRP

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.