Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Santa Ana, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
e City of Rancho Cucamonga ("City") will receive sealed bids for the materials, supplies, equipment and or services set forth herein, subject to all conditions outlined in the Bid Package, Plans and Specifications. 1. PROJECT Description of Work: Banyan Street Avenue Pavement Rehabilitation Project, from Haven Avenue to Rochester Avenue The scope of work to be performed consists of, but not limited to, PCC access curb ramps, 6 AC pavement, asphalt cold milling, asphalt rubber hot mix overlay, video detection, adjusting existing manholes, water valves to new grade, pavement markers, signing and thermoplastic striping, green thermoplastic bike lane, and other items of work as shown on the plans. Engineer's Estimate is $1,900,000. total of 60 working days to complete the project. 4. CONTRACTOR LICENSE: In accordance with provisions of Section 3300 of the California Public Contract Code, the City has determined that Contractor shall possess any and all contractors licenses, in form and class as required by any and all applicable laws with respect to any and all of the work to be performed under this contract including, a ClassA (General Engineering Contractor) or Class C12 (Earthwork and Paving Contractor) in accordance with the provisions of the Contractor's License Law (California Business and Professions Code, Section 7000 et. seq.). Contractor shall also employ at least one technician who shall be involved in the performance of all detection work certified as an International Municipal Signal Association (IMSA) Traffic Signal Senior Field Technician Level III. 5. PREVAILING WAGES: In accordance with the provisions of Section 1770, et seq., of the Labor Code, the Director of the Industrial Relations of the State of California has determined the general prevailing rate of wages applicable to the work to be done. The Contractor will be required to pay to all persons employed on the project by the Contractor sums not less than the sums set forth in the documents entitled "General Prevailing Wage Determination made by the Director of Industrial Relations pursuant to California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1773, 1773.1. BID SECURITY: Each bid shall be accompanied by bid security in the form and amount specified in Public Contract Code Sections 20170 and 20171. See Bid Package for details. 7. PAYMENT BOND and Completion Bond: A Payment Bond and a Completion Bond, each in the amount of 100% of the contract amount, will be required of the Contractor. 8. CONTACT Questions regarding this Notice Inviting Sealed Bids shall be submitted five (5) calendar days prior to bid opening and shall be directed to Project Manager: Cesar Guevara, Associate Engineer (909) 7744057. The City of Rancho Cucamonga reserves the right to reject any bid or all bids and to waive any informality or irregularity in any bid. Any contract awarded will be let to the lowest responsive and responsible bidder. Attest: Janice C. Reynolds, City Clerk, City of Rancho Cucamonga.
Bid Results
Roads / Highways
$1,729,088.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2023
July 31, 2023
Multiple Locations, Santa Ana, CA
Related To This Project
Santa Ana, CA
Bid Date: Oct 06 2020
Santa Ana, CA
Bid Date: Aug 19 2020
Santa Ana, CA
Bid Date: Jun 27 2023
Santa Ana, CA
Bid Date: Jun 26 2023
Santa Ana, CA
Bid Date: Jun 26 2023
Santa Ana, CA
Bid Date: Jul 06 2023
Santa Ana, CA
Bid Date: Jun 29 2023
Santa Ana, CA
Bid Date: Jun 16 2023
Santa Ana, CA
Bid Date: Nov 05 2020
Santa Ana, CA
Bid Date: Dec 16 2020
Santa Ana, CA
Bid Date: Jun 05 2023
Santa Ana, CA
Bid Date: May 31 2023
Santa Ana, CA
Bid Date: Jun 06 2023
Santa Ana, CA
Bid Date: May 30 2023
Santa Ana, CA
Bid Date: May 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.