BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2023 at 8:00 PM

Updated January 29, 2024

Site work and paving for a mixed-use development in Saint-Lambert, Quebec. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.

Bid is cancelled Reference number : 1723936 Deadline for receipt of complaints: 2023-05-23 Submission sent electronically accepted: No The City of Saint-Lambert wishes to carry out work to sectorize two parts of the aqueduct network, namely the Upper Edison and Dauphiné sectors. In order to complete the sectorization of the Upper Edison sector, a meter room must be installed on Cartier Street near #204 followed by a valve downstream. For the Dauphiné sector, a meter room must be installed on Avenue du Béarn between Rue de Savoie and Rue de Bourgogne with four new valves. Two valves must be installed upstream and downstream of the meter room. A valve will have to be added at the entrance to rue du Dauphiné near the intersection of boulevard Simard in boul. Plamondon and the last gate must be added on avenue des Ardennes east of the intersection of rue des Vosges. Installation of drinking water pipes, valves, meter chamber with purge, water meter, cellular transmitters and other accessories; pavement foundation works; paving; curbs and other concrete works; landscaping and maintenance of traffic, all as required in the plans and specifications; The works described above are not exhaustive and are only intended to inform the CONTRACTING PARTY of the scope of all the works to be carried out. Start Date: 08/07/2023 End Date: 10/13/2024

Final Planning

Sidewalks / Parking Lot

$300,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
419
Active Projects
230
Bidding Soon
2,858
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2023

August 7, 2023

Project location map

To Be Determined, Saint-Lambert, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.