Published July 13, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Victoria, British Columbia. Completed plans call for site work for a bridge / tunnel.

The District of Highlands, as part of this Invitation, have four other culvert locations for removal / replacement for which there is no Engineering. Culvert #3 (Two culverts): Location: 747 Finlayson Arm Road. 1st Culvert Remove existing 300mm x 12 m CSP Culvert. Backfill and compact in lifts with MMCD acceptable subgrade and base course. Repave with 50mm thickness of Hot Mix Asphalt. 2nd Culvert Remove existing 300mm CSP culvert and replace with 13 metre length of dual walled HDPE pipe in same alignment. Repave with 50mm thickness of Hot Mix Asphalt. Dispose of waste culvert and excavated material. Install new Rock Mortar headwall / end wall at both inlet and outlet. Water course flows to downstream fish habitat - Environmental Protection measures apply. Culvert #4: Location: 767 Finlayson Arm Road (One culvert). Remove existing 300mm x 10 metre (plus / minus) length of CSP culvert. Backfill and compact in lifts with MMCD acceptable subgrade and base course. Repave with 50mm thickness of Cold Mix Asphalt. Dispose of waste Re ditch approximately 50 lineal metres of the existing ditch to allow water to flow into the culvert crossing at York Ridge. Water course flows to downstream fish habitat - Environmental Protection measures apply. Culvert #5: Location: 821 Finlayson Arm Road (One culvert) Remove the existing 300mm CSP culvert and replace it with a used 600mm diameter - 12 metre length of surplus dual walled culvert that is located at the Fire Hall on Millstream Road. Repave with 50mm thickness of Cold Mix Asphalt. Dispose of waste Install new Rock Mortar headwall / end wall at both inlet and outlet. Water course flows to downstream fish habitat - Environmental Protection measures apply. Culvert #6: Location: 867 Finlayson Arm Road. Replace existing 600mm CSP culvert with 12 metre length of 600mm dual walled HDPE pipe in same alignment. Repave with 50mm thickness of Cold Mix Asphalt. Dispose of waste Install new Rock Mortar headwall / end wall at both inlet and outlet. Water course flows to downstream fish habitat - Environmental Protection measures apply

Award

Bridges / Tunnels

$316,675.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
37
Bidding Soon
3,314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

August 15, 2023

Project location map

Multiple Locations, Victoria, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.