BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Crowley, Louisiana. Contact the soliciting agency for additional information.

Acadia Parish Police Jury is requesting submittal of qualification statements from professional engineering and planning firms interested in performing professional engineering services at the LeGros Memorial Airport (3R2) for the project period of approximately three (3) years with the option for two, one-year extensions. Projects are to be submitted to the Federal Aviation Administration and LA DOTD Division for approval. The project description includes: 1. Airfield Perimeter Fence - Phase I (Landside Fencing) 2. Taxiway & AG Ramp Panel Repair & Joint Reseal 3. Airfield Drainage Improvements - Phase IIIB (Construction) 4. Airfield Perimeter Fence - Phase II (Airside Fencing) 5. 5 Unit Hangar and Apron 6. Airfield Markings - Rehabilitation 7. Airfield Lighting Upgrade to LED 8. Runway 4-22 Parallel Taxiway - Phase I (Design) 9. Runway 13-31 Lighting Improvements 10. Runway 4-22 Parallel Taxiway - Phase II (Construction) 11. Aviation Fuel System The scope of services may include topographic surveys and preliminary investigations, preparation of preliminary and final construction plans and specifications, cost estimates, grant management, construction administration, resident inspection and other special services. These projects are to include project administrative procedures and any additional projects that are funded within the time frame of the professional services contract. Project implementation is totally dependent upon FAA and DOTD funding.' Firms interest in performing theses services shall furnish three (3) copies of their statement of qualifications on a Standard Form 330 (SF330). Scoring of the selection criteria shall be on a numerical scale of 1 to 5, with 5 being the highest possible score and 1 being the lowest possible score. The score for each criterion will be multiplied by its weight factor, which indicated the importance of each criterion as it relates to this contract. Questions regarding this project should be addressed to the airport manager. Firms wishing to apply must submit a fully completed SF-330 Form. Failure to provide all information requested might result in the submission being considered non-responsive and the firm will not be given a total score in the evaluation process. The method of Contractor Selection has not been Determined at this time.

Conceptual

Transportation Terminals

Public - County

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
12
Bidding Soon
293
All Active Projects
108
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

img_map_placeholder

To Be Determined, Crowley, LA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.