BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 20, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Stockton, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work consists of grinding, removal and 2" overlay on Boone Drive, Ellsberg Drive, Davis Avenue. Phase 1 (Boone and Ellsberg) to be completed in thirty (30) days from Notice to Proceed. Phase 2 (Davis) to be completed in October, 2023 in 10 days. Paving consists of 52,500 SF of grinding, 16,580 SYD of fabric and 2,732 tons of HMH. New or replaced pavement striping as shown on plans. Additionally, there will be one (1) optional bid item for a Container Yard Access Road. Port specifically reserves the right, in its sole discretion, to reject any or all Bids, or rebid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work.

Award

Roads / Highways

$605,552.00

Public - State/Provincial

Paving, Site Work

11

8

5

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
560
Active Projects
285
Bidding Soon
3,042
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2023

August 28, 2023

Project location map

Multiple Locations, Stockton, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.