BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fort Morgan, Colorado. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; and for paving for a sidewalk / parking lot.

Reference Number 0000320582 The project involves modifications to the Departments of Human Services Parking lot and sidewalks. Purpose of the project is to reduce damage and/or pooling of water in specific areas. This project will need to be done in sections/areas/phases with areas of the highest order to be completed first. All work must comply with the drainage study. Bid Intent Not Available Question Acceptance Deadline 06/15/2023 02:00 AM EDT Questions are submitted online No Bonding Requirements - Bid Bond 100 % - Performance Bond 100 % Contact Information Karla Powell 9705423500 ext. 1410 kpowell@co.morgan.co.us All contract work must be completed on or before October 31, 2023. The project involves modifications to the Departments of Human Services Parking lot and sidewalks. Purpose of the project is to reduce damage and/or pooling of water in specific areas. This project will need to be done in sections/areas/phases with areas of the highest order to be completed first. All work must comply with the drainage study in Exhibit A. Area 1 Main Entryway: The main entryway Is located on the northwest side and is highest area of concern. The walkway may be narrowed and regraded. This walkway is connected to the parking lot and a fall in grade may be necessary. Areas on either side of the walkway should be regraded to control runoff and keep water off the walkway. New gutters for the entire building are necessary to route water away from the building. Current soil located at the front entrance of DHS, shall be replaced with non-expansive soil. The proposal shall address the phases of this portion of the project to ensure client accessibility to the building. No curbs will be added to the front parking lot due to ADA Regulations. Area 2, 3 & 4 Northeast & Northwest Parking Lot: The northwest parking lot will be entirely repaved with concrete to ensure better grading of the flat work and reduce water collection areas. Remove asphalt in the parking lot and replace with concrete. A new sidewalk will be installed and constructed additionally. Area 5 East Parking Lot: The building slab on the eastside of the building should be replaced to drain away from the building. Existing concrete under transformer will not be disturbed. The new slab should be constructed with a grade adjustment to ensure water drains away from the building. Modifications to the curb/sidewalk to create ADA compliant entrance, including transition from the parking lot. Adjacent parking lot asphalt will be removed and replaced with concrete.

Post-Bid

Water / Sewer

$700,000.00

Public - County

Paving, Site Work

9

9

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
95
Bidding Soon
1,354
All Active Projects
560
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 21, 2023

July 21, 2023

October 31, 2023

img_map_placeholder

800 E Beaver Ave, Fort Morgan, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.