Renovation of a military facility in Los Angeles, California. Completed plans call for the renovation of a military facility.

Amendment 02 is issued. Available to interested parties who provide a UEI number (with current SAM registration), and GACA or gmail address to krista.miller@gsa.gov. Solicitation is now available for interested parties. The Solicitation includes Controlled Unclassified Information. For access to all the Solicitation documents, email Contracting Officer, Krista Miller, krista.miller@gsa.gov with your GACA or Google email address. If you do not have a Google or GACA email address, you may obtain one through the following steps: GSA uses Google to provide employees with a way to collaborate in real time, and to create, edit and share work from anywhere. To enable simliar sharing and collaboration in Google with our government customers and business partners, while also ensuring that this shared information is safeguarded and secure, we've created a specialized Gmail account process called GACA - short for the GSA Affiliated Customer Accounts (GACA). Collaborative data stored on GSA's Google Drive and Google Sites systems are compliant to the Federal Information Processing Standard (FIPS) 140-2. This standard ensures that access and transmission occurs via a secure web page using the TLS 1.2 encryption standard. GACA is only authorized for sharing information on Google Drive and Google Sites, it is not authorized to be used for email communications. Applicability - GACA is for those who work for our government customers and business partners who do not use Google in their workplace. Agencies and civilian partners that are using Google in their workplace do not need to create a GACA account. GACA accounts must NOT be used by GSA employees and contractors in lieu of a gsa.gov account. How to create a GSA Affiliated Customer Account (GACA) in Gmail The person who will be using the GACA account (the government agency customer or the business partner) must create a Gmail account at http://mail.google.com/mail/signup and follow the process below: o enter their first name and last name, o enter their username: must start with "GSA." then first name, last name - example: GSA.johnsmith@gmail.com (mandatory), o complete all required fields, accept the Terms of Service and submit the request, and o set up 2-Step Verification (also known as two-factor authentication) using a smart phone that can receive simple messages (mandatory). The GSA IT Security Staff continuously monitors all shared files in Google Drive, and sharing in GSA's Google Sites. If non-compliance with this process is detected, then our staff will notify users of non- compliance with this process. After notification, if the sharing has been determined to be with a user that maintains a G Suite account, no further action will be required. Scope Description: The contract is anticipated to involve the following work to be done at the federal building at 300 N. Los Angeles St., Los Angeles, CA: The overall strategic project goal of the Design-Build (DB) Contractor is for the replacement of (4) 2 Cell Cooling Towers and to perform structural sub-platform and main platform repairs and/or replacement within an occupied building without disruption to occupants and to utilize sustainable design and construction strategies where applicable and practical. Phase 1 Cooling Tower 1 and/or 2: Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Furnish and set-up (1) 500 Ton temporary skid mounted Cooling Tower adjacent to the building on Los Angeles St. within a lockable chain link fence enclosure affording adequate NEC and service clearances, and pipe temporary bypass CWS/R lines to POCs in the basement. Provide temporary make-up water (MUW) and drain down piping indirectly to the nearest approved sanitary sewer. Provide temporary electrical power via a 200 KVA skid mounted genset and electrical disconnect and service power to the skid mounted Cooling Tower. Provide biocidal and other chemical treatment as needed for a temporary cooling tower. Obtain necessary permits and special inspections if/as required from the City of Los Angeles Public Works. Disconnect controls from CT-1 and/or 2, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-1 and/or 2 and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-1 and/or 2 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness. Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-1 and/or 2 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to-endpoint testing and verification. Phase 2 Cooling Tower 3 and/or 4: Replace the (2) existing nominal 900-ton Cooling Towers (CTs) in one or two phases of construction. Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Disconnect controls from CT-3 and/or -4, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-3 and/or -4 and their respective CW pumps and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-3 and/or -4 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or an elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness. Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-3 and/or -4 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to- endpoint testing and verification. (Note: There is no BAS programming nor graphics scope) 05/17/2023: Amendment 01 issued. Available to interested parties who provide a UEI number (with current SAM registration), and GACA or gmail address to krista.miller@gsa.gov. Estimated Range - between $5M and $10M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$10,000,000.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
251
Bidding Soon
3,766
All Active Projects
1,687
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 19, 2023

August 17, 2023

img_map_placeholder

To Be Determined, Los Angeles, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.