BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in East Watertown, Massachusetts. Completed plans call for site work for a water / sewer project.

The City of Watertown, Massachusetts is requesting written quotations for the replacement and upgrades to the Underground Storage Tank (UST), Tank Pad, and Manhole Replacement located at the Public Works Facility, 124 Orchard Street, Watertown, MA 02472. The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, trash disposal of old equipment, and all other things necessary to do all the work required for the completion of the project. SCOPE OF SERVICES: A Massachusetts licensed Contractor shall be hired to replace the UST tank pad and manholes located at the Department of Public Works in Watertown, MA. This work is necessary to upgrade the facility and its tank to a Stage 1 Enhanced Vapor Recovery (EVR) System. This work will consist of performing concrete and manhole repairs, the manholes are sinking and this could lead to tank damage and other Underground Storage Tank issues if left unresolved. Work to include saw cut, jack hammer, and remove existing Diesel and Gasoline tank pad and manhole covers, remove materials from site. Temporary fencing and barricades will need to be set up around the perimeter of the tank pad during work. Install new manhole covers over existing tank top components including, tank sump, below grade spill buckets and vapor buckets, install new 4" steel riser pipes and vapor/vent extractor risers to match existing grade. Install EMCO Weaton double wall spill buckets, nipple riser seals, swivel fill and vapor, overfill drop tubes, fill, and vapor caps. Replace both 18" manway covers with ring over both annular spaces. Furnish and install 1/2 " rebar and pour new 8" brimmed finish concrete pad around manholes, using 4,000 psi concrete, with troweled edges and cut expansion joints. Asphalt around the edges of the pad shall be repaired as needed. Clean up site and remove fencing and barricades. Materials to include: o One (1) 44" Composite Manhole Covers o Two (2) 18" Steel Manhole Covers o Two (2) 24" Steel Manhole Covers o Two (2) 19" Composite Manhole Covers o 1/2 " Rebar o Approximately 20 Yards of 4,000 PSI 3/4 " Concrete o Approximately 250 Sq. Ft. of Asphalt o Forms

Award

Water / Sewer

$42,795.00

Public - City

Site Work

4

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
147
Bidding Soon
2,865
All Active Projects
1,208
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

June 30, 2023

img_map_placeholder

124 Orchard St, East Watertown, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.