Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 4, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Lehi, Utah. Completed plans call for site work for a road / highway; sidewalk / parking lot; water / sewer project; for paving for a road / highway; and sidewalk / parking lot.

The Work under this proposed contract includes: Installation of curb, gutter and sidewalks, ADA ramps, fire hydrant, drive approaches, and driveway improvements. Includes removal of existing curb and gutter, sidewalk & storm drain facilities. Includes asphalt saw cutting and new asphalt paving. g. The Owner requires the Project to be substantially completed by October 1st, 2023.

Post-Bid

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

6

8

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
63
Bidding Soon
1,214
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

July 6, 2023

Project location map

Multiple Locations, Lehi, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed