Published June 2, 2023 at 8:00 PM
Updated November 9, 2024
Site work and paving for a mixed-use development in Sturtevant, Wisconsin. Completed plans call for site work for a road / highway; sidewalk / parking lot; water / sewer project; for paving for a road / highway; and sidewalk / parking lot.
Construction of the 2023 PAVING PROGRAM includes: pulverizing asphaltic pavement, excavation, grading, base aggregate dense, manhole and inlet adjustments, curb and gutter spot replacements, curb ramp replacements, asphaltic pavement, concrete pavement, pavement marking, traffic control and erosion control as well as street reconstruction and storm sewer relay. Approximate quantities include: 11,000 square yards of pulverize asphaltic pavement, 3,700 cubic yards of excavation, 5,400 tons of base aggregate dense, 3,700 tons of asphaltic pavement, 4,100 linear feet of concrete curb and gutter, 35 manhole and inlet adjustments, 6,800 square feet of concrete sidewalk, 380 linear feet of storm sewer, and 3,900 linear feet of pavement marking. \ This is a unit price contract. The estimated quantities as indicated above and on the Bid Schedule are inserted only for the purpose of determining the low bidder. \ Project is to be substantially complete on, or before, October 13, 2023, excluding Section 3 which shall begin work no sooner than June 9, 2023, and be complete before September 5, 2023. \ The Contract letting shall be subject to the provisions of Sections 61.54, 62.15 and 66.0901 of the Wisconsin Statutes.
Bid Results
Roads / Highways
$1,159,298.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 04 - Masonry
Division 09 - Finishes
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2023
June 9, 2023

Multiple Locations, Sturtevant, WI
Related To This Project
Sturtevant, WI
Bid Date: Jun 21 2023
Sturtevant, WI
Bid Date: Jun 01 2023
Sturtevant, WI
Bid Date: Jul 13 2023
Sturtevant, WI
Bid Date: Aug 22 2023
Sturtevant, WI
Bid Date: Aug 21 2023
Sturtevant, WI
--
Sturtevant, WI
--
Sturtevant, WI
Bid Date: Sep 14 2020
Sturtevant, WI
Bid Date: Apr 04 2023
Sturtevant, WI
Bid Date: Apr 06 2023
Sturtevant, WI
Bid Date: Mar 30 2023
Sturtevant, WI
--
Sturtevant, WI
Bid Date: Sep 13 2022
Sturtevant, WI
Bid Date: Jul 11 2023
Sturtevant, WI
Bid Date: Aug 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.