Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 26, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a mixed-use development in Bismarck, North Dakota. Completed plans call for site work for a educational facility.
Concrete Projects at multiple Bismarck Public Schools sites, Bismarck, North Dakota Each bid shall be submitted in a sealed opaque envelope upon which there is disclosed the necessary information as required by the Bid Documents. Please mark Bismarck Public Schools Concrete Projects on the envelope. The Owner reserves the right to hold all legitimate bids for a period of Thirty (30) days after the date fixed for the opening thereof. The Owner further reserves the right to reject any and all bids or portions thereof and to waive irregularities, and the Owner shall incur no legal liability for the payment of any monies until the contract is awarded and approved by the proper authorities. Project 24-1: Highland Acres Elementary Concrete Highland Acres Elementary School Concrete: o Map is for general location purposes. Contractor responsible for taking measurements for bidding. o Area (corners) marked out in white paint. o 5" 4,500 psi concrete with Macro synthetic Fibers. Dosage shall be 4LB/CY. o 4" Crushed concrete base. o Joint spacing shall not exceed 8'. o 3/4 expansion material shall be placed along building edge. Seal all expansion joints. o Construction joints shall have 24" rebar at 30" on center and sealed. o Contraction joints sawed do not need to be sealed. o Contractor shall locate all utility lines prior to beginning construction. Project 24-2: Myhre Elementary Concrete Myhre Elementary School Concrete: o Map is for general location purposes. Contractor responsible for taking measurements for bidding. o Area (corners) marked out in white paint. o 5" 4,500 psi concrete with Macro synthetic Fibers. Dosage shall be 4LB/CY. o 4" Crushed concrete base. o Joint spacing shall not exceed 8'. o 3/4 expansion material shall be placed along building edge. Seal all expansion joints. o Construction joints shall have 24" rebar at 30" on center and sealed. o Contraction joints sawed do not need to be sealed. o Contractor shall locate all utility lines prior to beginning construction. Project 24-3: Facilities & Transportation Concrete Facilities & Transportation Concrete:
Post-Bid
Educational
$800,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 31, 2023
July 1, 2023
Multiple Locations, Bismarck, ND
Related To This Project
Bismarck, ND
Bid Date: Jun 13 2023
Bismarck, ND
Bid Date: Jun 09 2023
Bismarck, ND
Bid Date: Jun 06 2023
Bismarck, ND
Bid Date: Jun 08 2023
Bismarck, ND
Bid Date: Jun 13 2023
Bismarck, ND
Bid Date: Jun 12 2023
Bismarck, ND
Bid Date: Jun 22 2023
Bismarck, ND
Bid Date: Jun 05 2023
Bismarck, ND
Bid Date: Jun 01 2023
Bismarck, ND
Bid Date: Jun 16 2020
Bismarck, ND
Bid Date: Jun 16 2020
Bismarck, ND
Bid Date: Mar 10 2021
Bismarck, ND
Bid Date: Mar 10 2021
Bismarck, ND
Bid Date: Mar 10 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
