BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2024 at 8:00 PM

Updated August 2, 2024

Renovation of a transportation facility in Truth or Consequences, New Mexico. Working plans call for the renovation of a transportation facility.

As of August 1, 2024 bids received were rejected as they were over the budget. No definite date for rebid. The proposed project includes the three project components: (1) the relocation and installation of the AvGas self-fuel pump and associated equipment to the existing aviation fuel facility; (2) the new construction of asphalt pavement to expand the existing terminal apron to facilitate fueling activity for aircraft; and (3) the mill and overlay of the existing terminal apron asphalt surface. The City of Truth or Consequences, reserves the right to reject any or all bids, to waive informalities, and to re-advertise. Bids must be accompanied by a certified check or a bid bond in the amount of not less than 5 percent of the total amount bid. A Contract Performance Bond and a Contract Payment Bond each equal to 100 percent of the Contract Price will be required for the successful Contractor. No bid may be withdrawn prior to October 15, 2024. Questions shall be submitted no later than five (5) business/working days before bid opening. Submit Questions to : ATTN: Cheryl A. Rodriguez Via EMAIL: crodriguez@deltaairport.com The Contractor shall have 60 calendar days to complete the project. Goals for minority participation for each trade: 45.9% Goals for female participation in each trade: 6.9%

Final Planning

Transportation Terminals

$1,424,971.00

Public - City

Renovation

25

9

6

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
39
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

February 1, 2025

Project location map

To Be Determined, Truth or Consequences, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.