EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 6, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a detention facility in Marienville, Pennsylvania. Completed plans call for the renovation of a detention facility.

A. The contractual obligations for Electronic Security Systems work shall refer to shop drawing level systems design, supply, installation, wiring, repair, and maintenance of the upgraded security system, including labor and materials by the approved Contractor. 1. Provide conduits, conductors, and cables required for systems specified in Division 26 and Division 28. 2. Provide electrical work, electrical infrastructure, junction boxes, and special backboxes required for new equipment. Provide distribution of UPS power to security equipment and to each system specified in Division 26 and Division 28. 3. Provide the upgrade of Video Surveillance System (VSS) consisting of the following: a. Install new IP Video Surveillance Cameras as shown on Contract Drawings. Contractor shall coordinate exact installation locations with field conditions to avoid existing devices or disturbances in the areas of installation b. Provide all new Category 6 cabling, fiber optic cabling, conduit, pathways, infrastructure, and power supplies as required for a complete and function Video Surveillance System. c. Provide new Video Management System and camera licensing as manufactured by Bosch. 1) "The above item has been approved by the Department as a proprietary item. No other item will be accepted. Section 9.6 of the General Conditions to the Construction Contract does not apply to the above item". d. Provide new video storage, servers, and equipment for recording and playback of all new video surveillance cameras provided under this project. e. Provide new equipment racks, PoE network switches, patch panels, power supplies, circuits and Uninterruptable Power Supplies (UPS). f. Provide new video surveillance workstations and monitors as required and shown on the Contract Drawings. Questions during the bid stage shall be submitted via e-Builder under the Q&A Board tab in the Package's Invitation to Bid. All questions related to the proposed work or proposed Contract Documents must be submitted in e-Builder no later than close of business ten (10) days prior to the Bid Opening Date. DGS has scheduled a non-mandatory BDISBO SDB/VBE Goal Setting Information session on Thursday, June 1, 2023 at 10:00 AM. The meeting will be hosted on Microsoft Teams. Link: https://teams.microsoft.com/l/meetupjoin/19%3ameeting_YWRhYmRiOGItNzkyMC00MzllLWJmZGItMzYzNmIyOWM0ZGE0%40thread.v2/0context=%7b%22Tid %22%3a%22418e2841-0128-4dd5-9b6c-47fc5a9a1bde%22%2c%22Oid%22%3a%22a592b7c0-4847-4d85-a3e1- da3e4448837d%22%7d Meeting ID: 227 817 611 235 Passcode: paWQww Or call in (audio only) +1 267-332-8737,,503542185# United States, Philadelphia Phone Conference ID: 503 542 185# Bid Result. DGS C-0377-0007 Ph1 .4 Base Bid 1:PENN OHIO ELECTRICAL $4,974,000.00 Base Bid 2:PENN OHIO ELECTRICAL $5,274,000.00 Base Bid 3:PENN OHIO ELECTRICAL $5,314,000.00

Bid Results

Jails / Prisons

$15,562,000.00

Public - State/Provincial

Renovation

144

18

9

2

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Wall and Door Protection, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Casework
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Schedules for Electronic Safety and Security, Schedules for Electronic Access Control and Intrusion Detection, Electronic Surveillance
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
72
Bidding Soon
742
All Active Projects
363
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

November 1, 2023

img_map_placeholder

1 Woodland Drive, Marienville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

SCI Forest - Update IP Cameras

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.