BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a municipal facility in Birmingham, Alabama. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Scope of work: Demolition of identified structures, as needed. Demolition of each structure shall be bid individually. Vendor shall provide all labor, services, equipment, materials, obtain permits, and supplies necessary to demolish the structure on Subject Property. Vendor is to remove all existing structures, driveway, basement, and footings, and fill the basement area with suitable soil. Concrete blocks, masonry, or other rubble from the demolished structures or any organic materials may not be used as fill. All foundation/concrete must be completely removed. All basement or other depressions, holes, or excavations, or ruts shall be cleared of all debris before filling operations are undertaken and the floors of basements, wells, cisterns, septic tanks and laterals or similar installations shall be removed or disposed of pursuant to Jefferson County Department of Health permit instructions. All structures of any nature shall be demolished on the Subject Property and the rubbish and debris removed from the Subject Property for legal disposal to an offsite location in an ADEM certified landfill. If a septic tank is present on Subject Property, Vendor shall provide a copy of Jefferson County Department of Health permit approval for disposing of septic tank. Vendor must be currently certified as an Alabama Safe State Asbestos Inspector to inspect each Subject Property and be responsible for identifying any asbestos containing material and for sending proper Notice of Asbestos Abatement and/or Demolition application to the Jefferson County Health Department Air and Radiation Protection Division and provide Jefferson County with said notice(s). For Subject Properties identified for having some form of asbestos material by laboratory testing, a currently certified Alabama Safe State Asbestos Abatement Vendor must supervise the demolitions and supervise the proper disposal of the refuse. All work shall be performed during the hours of 7:00 a.m. - 5:00 p.m., Monday through Friday. Vendor will not be compensated for any unapproved work. Vendor is required to cooperate with the County and/or State inspectors who may monitor site activities to enforce compliance with the contract provisions. All demolition permits may be applied for online at permits.jccal.org/citizen access. Vendor is responsible to first notify all applicable utility companies of the demolition prior to beginning work and obtain appropriate permits. Vendor shall provide proof of termination for all existing utilities, such as sewer, gas, electrical services from public, or private utility providers included in each Demolition Permit, which is available at permits.jccal.org/citizen access. Vendor is responsible for obtaining any necessary Erosion Control Permit. Vendor shall disconnect and cap the sewer and water line, fill basement area, coordinate all required disconnects by private or public utility companies and obtain all demolition or other permits associated with these operations and provide copies of required permits to Jefferson County. Vendor is to safely access structures, including garages and detached outbuildings, and remove all waste and debris for disposal. All rubbish and debris found on Subject Property at the start of work and that results from the demolition activity or deposited on the site by others during the duration of the Vendor work shall be removed and legally disposed of by the Vendor who shall always keep the Subject Property and public rights-of-way clear. Upon completion of the work, the Vendor shall remove all temporary construction equipment, salvaged materials, and debris of all kinds leaving Subject Property in a next condition. Trash burning on the Subject Property is prohibited. Construction debris must not become part of any fill placed or left on the Subject Property. All questions must be typewritten and emailed to Florencie U. Patton at underwoodf@jccal.org by 4:00 p.m. on 5/31/23.

Post-Bid

Municipal

$200,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
29
Bidding Soon
540
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2023

July 7, 2023

img_map_placeholder

To Be Determined, Birmingham, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.