BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Macon, Georgia. Completed plans call for the renovation of a municipal facility.

Detailed Scope of Work o The Contractor shall furnish all materials, equipment, labor and supervision to perform and complete the project described below. o Remove any unwanted equipment/curbs from roof area o Remove existing coping metal and replace with new 24 ga o Install 60 mil Carlisle Fleece Back TPO fully adhere o Provide a 20 year system and a 5 year workmanship warranty o All metal replaced with 24 ga metal o Contractor to install new retro fit roof drains o Contractor to rework all emergency overflow drains o No extra material to be stored on roof (only daily material to be placed on roof each day) o The Contractor shall confirm allowable working hours with Owner before mobilization. o Contractor shall obtain approvals in advance for all lay down and storage areas. o Contractor is responsible for protection of all surfaces including those not in the scope of work from construction dust, debris or damage during construction up until final acceptance. o Contractor will maintain clean work areas. Remove and dispose of all demolished materials and construction debris. Site must be cleaned every day at the completion of work. Contractor shall take extra precautions to pick up all debris, nails and fasteners from the ground and all surrounding area and finishing with magnetic pickup to ensure safety and cleanliness. Upon completion of work, all construction areas shall be left clean and free from debris. Clean all dust, dirt and droppings. (Macon-Bibb will mark area for dumpster supplied by contractor) o Contractor to provide timeline to include projected time needed for materials, start date and finish date. o Contractor shall be responsible for all cost associated with crane and any equipment needed to complete the project. o Contractor shall schedule placement of all equipment used based on parking lot traffic, o The Contractor will be responsible for obtaining such applicable permits and the Owner will be responsible for compensating the Contractor for permit fees and any design necessary to obtain such permits or related approvals o Contractor to provide Carlisle certifications and Carlisle representative contact. o Contractor shall provide start/finish time-frame from date bid is awarded. NO BIDS WILL BE ACCEPTED AFTER THIS DESIGNATED TIME. Minority, Women Owned and other Disadvantaged Business Enterprises are encouraged to participate in the solicitation process. Additionally, respondents are encouraged to use M/W/DBE subcontractors where possible. Deadline for submitting questions is Friday, June 9, 2023. Questions to be submitted via email to Lhardwick@maconbibb.us Bid Bond Bids, in order to be considered, shall be accompanied by a bid bond, payable to the Owner, in amount not less than five-percent (5%) of the total base bid. This bid security shall become payable to the Owner only if the bidder, to whom award is made, should fail to execute a contract with the Owner and furnish bond and insurance in accordance with terms of the contract within ten (10) days after notification of award.

Award

Municipal

$91,300.00

Public - County

Renovation

6

5

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
112
Bidding Soon
1,514
All Active Projects
685
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 22, 2023

July 24, 2023

February 19, 2024

img_map_placeholder

4499 Riverside Dr, Macon, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.