BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in Orange, California. Completed plans call for the renovation of a 88,000-square-foot municipal facility.

All RFP questions must be posted via the Countys online bidding system and are due by 07/10/2023 at 5:00 PM PT The proposed Project is for the Orange County Youth Transition Center (YTC) located at 331 The City Drive South, Orange, CA 92868. Construction is targeted for completion by May 2026. The current Project expected cost is approximately $100,000,000. Construction is targeted for completion by May 2026. a. Description of the proposed site layout and organization of YTC facilities, parking and site amenities that best meets the needs of Probation. Description of the proposed siting for new long-term housing unit for Juvenile Hall. Description of the proposed site layout and organization of Independent Living Units, parking and site amenities that best meets the needs of program providers, community organizations and Probation. b. Design information, including basis for design for major architectural elements, building structural systems, and major building engineered systems including, but not limited to, civil, plumbing mechanical, fire-protection, electrical power, lighting, audio-visual, IT, access control and security systems for YTC, Juvenile Hall and Independent Living Unit facilities. c. Description of plan for maintaining secure vehicle and pedestrian access to the campus during demolition of existing perimeter secure fencing, gates and equipment and installation of new secure fencing and access. d. General description of plan for protecting existing buildings and site features during demolition and new construction activities including access and continued operation of Control and the intended design and construction approach. e. General description of proposed perimeter secure fencing, site access control features, parking, site landscape areas, site hardscape areas, major associated infrastructure components, and the intended design and construction approach. f. Description of proposed connection to existing Juvenile Hall campus infrastructure systems including shutdown and tie-in plans. g. Operation and maintenance requirements, including start-up plan and staff training schedule. In addition, the project includes several facilities that will operate outside the YTC: o A 24-bed Long-Term Housing Unit to be operated as part of Juvenile Hall o A Classroom / Library Building for use by Juvenile Hall o Ten (10) Independent Living Units providing twenty (20) beds of supportive housing for males and females, and associated program space for youth transitioning out of Juvenile Hall, YLA and YTC. This facility will be located outside the secure perimeter. The total project is estimated at approximately 88,000 gross square feet of new building area and includes site access, new parking areas, outdoor recreation and landscape development and connections to existing Juvenile Hall systems and infrastructure. To create a clear area for construction of new facilities, the project includes demolition of several occupied and unoccupied buildings, perimeter security fencing, site amenities and landscaping. The campus has many mature trees that Orange County wishes to keep, and this should be taken into consideration during planning and design. All new facilities should be aesthetically pleasing with ample access to natural light and outdoor spaces. Integrated outdoor space should be available for programs, learning, recreational and leisure activities. New facilities and site development should be reminiscent of modern college and high school campus design with a cohesive material, color, and landscape palette used throughout. New buildings should look non-institutional and welcoming and provide youth and staff with spaces that feel natural, calm, and comforting. YTC should be designed with a sense of freedom and openness while still providing all the necessary features of a modern, secure juvenile facility. The use of institutional fencing and razor-wire is highly discouraged. The project should use the design and organization of new buildings, new landscape and new hardscape features to provide visual and physical separation between the YTC facility and Juvenile Hall. To the greatest extent possible, design of YTC should not rely on the use of permanent fencing, access control or gates to provide required facility separation.

Post-Bid

Municipal

$100,000,000.00

Public - County

Renovation

331

44

34

7

Subscribe For Documents

85 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
110
Bidding Soon
2,360
All Active Projects
1,052
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2023

October 9, 2023

img_map_placeholder

331 The City Dr S, Orange, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.